Zobrazeno 1 - 1
of 1
pro vyhledávání: '"Napoleone Luca"'
Publikováno v:
Day 1 Mon, March 13, 2023.
The objective in any perforated completion is to maximize the productivity index in a cost effective manner, which is to increase the flow rate for a given driving force (draw down) or to minimize the draw down for a given rate that could be achieved