Zobrazeno 1 - 9
of 9
pro vyhledávání: '"N. O. Solheim"'
Autor:
J.C. Wolles, P.K. Frandsen, Ph. Gayet, N. O. Solheim, S. Claudet, G. Winkler, Ch. Titcomb, A C Juillerat, P. Vergult, H.K. Kuhn
Publikováno v:
Cryogenics. 34:83-86
Conception and realisation of the industrial process control system and application programs for the four new 12 kW/4.5K cryoplants, and the 192 superconducting accelerating cavities, were critical activities in the implementation of the cryogenic sy
Autor:
S. Claudet, M. Barranco-Luque, J. Schmid, P.K. Frandsen, N. O. Solheim, Ph. Gayet, K.P. Hoffmann, C. Wyss, W.K. Erdt, G. Winkler, D. Güsewell
Publikováno v:
Cryogenics. 32:151-154
The cryogenics for the LEP200 project covers the liquid helium bath cooling requirements of about 200 superconducting RF acceleration cavities to be installed in the ring tunnel of CERN's electron-positron collider LEP. It includes two cryoplants of
Publisher Summary At CERN the upgrade of the LEP e+e- collider towards higher beam energies is under way by installing superconducting cavities in the ring. In 1995 superconducting cavity modules have been operated together with ambient temperature c
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::52b1ae3c5a0453e03e384277e3c707ce
http://cds.cern.ch/record/315769
http://cds.cern.ch/record/315769
Autor:
Ph. Lebrun, M. Barranco-Luque, Ch. Titcomb, P.K. Frandsen, N. O. Solheim, U. Wagner, G. Winkler, S. Claudet, J. Schmid, D. Güsewell, Ph. Gayet, W. K. Erdt
Publikováno v:
A Cryogenic Engineering Conference Publication ISBN: 9781461380221
Between 1990 and 1994 CERN procured, installed and commissioned six large-scale helium cryoplants for its programme of superconducting acceleration cavities in the electron-positron collider LEP. Two European suppliers were selected to each provide o
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::c337746cc7987daff536bc08ceaa004b
https://doi.org/10.1007/978-1-4613-0373-2_98
https://doi.org/10.1007/978-1-4613-0373-2_98
The LEP 2 project at CERN, designed to increase the collision energy in the LEP electron-positron collider from 50 to 90 GeV/beam, involves the installation of 192 superconducting (sc) accelerating cavities in the straight sections of the LEP ring cl
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::5b5d9cd2aec4cbd45586625dad03a711
http://cds.cern.ch/record/270157
http://cds.cern.ch/record/270157
Autor:
K. Löhlein, W. K. Erdt, U. Wagner, N. O. Solheim, A.-E. Senn, D. Güsewell, B. Chromec, B. Ziegler, A. Meier, T. Saugy, G. Winkler
Publikováno v:
Supercollider 5 ISBN: 9781461360360
CERN has ordered helium refrigeration / liquefier plants for the LEP200 project in 1991 with an equivalent refrigeration capacity of 12kW at 4.5 K. The cold equipment of these plants is divided into two parts with a cut on a temperature level of roug
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::7ab23d951855eeae1722de6ffca31b7f
https://doi.org/10.1007/978-1-4615-2439-7_23
https://doi.org/10.1007/978-1-4615-2439-7_23
Autor:
G. Winkler, B. Ziegler, D. Güsewell, K. Kurtcuoglu, U. Wagner, K. Löhlein, A. E. Senn, N. O. Solheim, P.K. Frandsen, W. K. Erdt
Publikováno v:
Advances in Cryogenic Engineering ISBN: 9781461360742
CERN has installed helium refrigeration plants for the LEP 200 project in 1991 with an equivalent refrigeration capacity of 6 kW at 4.5 K. The cold boxes of the plants were specified to be installed in the LEP tunnel and were therefore limited regard
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::90f32e12b94331e79cc7b248bac80cec
https://doi.org/10.1007/978-1-4615-2522-6_67
https://doi.org/10.1007/978-1-4615-2522-6_67
Autor:
R. Clerc, U. Wagner, D. Güsewell, B. Ziegler, W. K. Erdt, K. Löhlein, G. Winkler, N. O. Solheim, B. Chromec, K. Kurtcuoglu
Publikováno v:
Supercollider 4 ISBN: 9781461365297
CERN has ordered helium refrigerator/liquefier plants for the LEP 200 project in 1990 with an equivalent refrigeration capacity of 6 kW at 4.5 K. The cold box of one of these plants is installed in the LEP tunnel and is therefore limited regarding it
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::22a1d40e309a5a6df96809da1aa8f7c1
https://doi.org/10.1007/978-1-4615-3454-9_24
https://doi.org/10.1007/978-1-4615-3454-9_24
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.