Zobrazeno 1 - 3
of 3
pro vyhledávání: '"N. G. Chura"'
Publikováno v:
Coke and Chemistry. 57:489-492
Problems arising in the reconstruction of coke battery 1 at Isfahan steel plant are considered. The construction of coke battery 1 (coke-oven capacity 27.3 m3) with a PVR-51 dust-free coke-discharge system and bottom heating-gas supply is described.
Publikováno v:
Coke and Chemistry. 57:408-412
The reconstruction of coke battery 1 at Isfahan steelworks is considered. The construction of a PVR-51 system at coke battery 1 (useful oven capacity 27.3 m3, with lower heating-gas supply, is described. The automatic temperature-monitoring system fo
Publikováno v:
Coke and Chemistry. 57:422-424
The reconstruction of coke battery 1 at Isfahan Steel Works is considered. The structure of the Dinas component in the insulating walls at coke battery 1 with a PVR-51 system is described; this battery has bottom supply of the heating gas; the useful