Zobrazeno 1 - 10
of 40
pro vyhledávání: '"Myung Jin Chae"'
Publikováno v:
Journal of The korean Association For Spatial Structures. 18:59-67
Publikováno v:
Journal of the Korea Institute of Building Construction. 15:631-639
In the unit modular construction, the unit module prefabricated in a factory with a high level of accuracy does not fit completely onto the ground-joint junction due to the low accuracy of the ground work. This difference in the level of accuracy can
Publikováno v:
KSCE Journal of Civil Engineering. 18:875-886
Construction firms have long attempted to forecast a project cash flow at the initial stage of a project, which is closely related to the payment conditions and financing schedules. There are, however, diverse risk factors influencing project cash fl
Publikováno v:
KSCE Journal of Civil Engineering. 17:1551-1561
While there have been many studies on life cycle cost analysis and preventive maintenance planning, this study proposes an innovative method of bridge asset management in South Korea. Two different levels of approaches were used in this study. First,
Autor:
Seung Heon Han1 shh6018@yonsei.ac.kr, Myung Jin Chae2 chae@yonsei.ac.kr, Keon Soon Im3 ksim21c@empal.com, Ho Dong Ryu4 eastskyryu@hdec.co.kr
Publikováno v:
Journal of Management in Engineering. Jan2008, Vol. 24 Issue 1, p21-31. 11p. 6 Diagrams, 6 Charts, 6 Graphs.
Publikováno v:
KSCE Journal of Civil Engineering. 17:610-619
This study suggests a formalized method to quantitatively assess the performance of construction Research and Development (R&D) projects. The procedures for the method development starts with identifying 40 performance measurement indicators reflecti
Autor:
Hye-Jin Sun, Myung-Jin Chae
Publikováno v:
Journal of Promotion Management. 19:54-75
This study reviewed the process of discussion and the present state related to the permission of product placement (PPL) in Korea. This study also reviewed opinions for or against PPL-related laws and regulations and the relaxation of PPL restriction
Publikováno v:
Korean Journal of Construction Engineering and Management. 13:13-23
While Category 1 and Category 2 bridges are intensively inspected and carefully managed, many small bridges that are not in the Category 1 and 2 are often forgotten until they decay in serious condition. Since many of these small bridges located in t
Publikováno v:
Automation in Construction. 21:237-252
A wireless sensor system has been suggested and tested in the place of forty five sensors of five types among the sensors used extensively in suspension bridges to prove the viability of wireless sensor network in actual implementation. ZigBee (IEEE
Publikováno v:
Automation in Construction. 20:808-817
The purpose of this study is to develop a mobile 3D work environment recognition system for civil earthwork. A mobile 3D laser scanner system and software have been developed in this research. This study is a part of Intelligent Excavation System (IE