Zobrazeno 1 - 10
of 60
pro vyhledávání: '"Moosung Jae"'
Publikováno v:
Nuclear Engineering and Technology, Vol 53, Iss 9, Pp 2859-2865 (2021)
One of the important issues raised from the Fukushima-Daiichi accident is the safety of multi-unit sites when simultaneous accidents occur at the site and recently a multi-unit PSA methodology is being developed worldwide. Since all operation modes o
Externí odkaz:
https://doaj.org/article/3619cce7b99745d3bf2a09cb1ebefa2b
Publikováno v:
Nuclear Engineering and Technology, Vol 53, Iss 9, Pp 2878-2887 (2021)
As the amount of fission product released from ISLOCA was overestimated because of conservative assumptions in the past, several studies have been recently conducted to evaluate the actual release amount. Among several pathways for the ISLOCA, most s
Externí odkaz:
https://doaj.org/article/51260684c01245e196907f76b74d0540
Publikováno v:
Nuclear Engineering and Technology, Vol 53, Iss 6, Pp 1979-1990 (2021)
Evacuation Time Estimate (ETE) can provide decision-makers with a likelihood to implement evacuation of a population with radiation exposure risk by a nuclear power plant. Thus, the ETE is essential for developing an emergency response preparedness.
Externí odkaz:
https://doaj.org/article/67ac4a5c510b4c2f839d66b08c37e51f
Publikováno v:
Nuclear Engineering and Technology, Vol 53, Iss 3, Pp 812-824 (2021)
In order to reduce risks from the Steam Generator Tube Rupture (SGTR) accident and to meet safety targets, various measures have been analyzed to minimize the amount of fission product (FP) release. In this paper, we propose an introduction of a Cont
Externí odkaz:
https://doaj.org/article/fd952b1077d148138eb56bfc1d682aaa
Publikováno v:
Nuclear Engineering and Technology, Vol 49, Iss 2, Pp 313-326 (2017)
The systematic management of plant risk is crucial for enhancing the safety of nuclear power plants and for designing new nuclear power plants. Accident sequence precursor (ASP) analysis may be able to provide risk significance of operational experie
Externí odkaz:
https://doaj.org/article/2a75f3faed7f413e82db586407f51570
Special Issue on the 13th International Conference on Probabilistic Safety Assessment and Management
Autor:
Moosung Jae
Publikováno v:
Nuclear Engineering and Technology, Vol 49, Iss 2, p 285 (2017)
Externí odkaz:
https://doaj.org/article/24e24094348c440aa6fc493646ee0ee7
Autor:
Seunghyun Jang, Moosung Jae
Publikováno v:
2022 6th International Conference on System Reliability and Safety (ICSRS).
Autor:
Dohyun Lim, Moosung Jae
Publikováno v:
2022 6th International Conference on System Reliability and Safety (ICSRS).
Publikováno v:
Nuclear Engineering and Technology, Vol 53, Iss 9, Pp 2878-2887 (2021)
As the amount of fission product released from ISLOCA was overestimated because of conservative assumptions in the past, several studies have been recently conducted to evaluate the actual release amount. Among several pathways for the ISLOCA, most s
Publikováno v:
Nuclear Engineering and Technology, Vol 53, Iss 6, Pp 1979-1990 (2021)
Evacuation Time Estimate (ETE) can provide decision-makers with a likelihood to implement evacuation of a population with radiation exposure risk by a nuclear power plant. Thus, the ETE is essential for developing an emergency response preparedness.