Zobrazeno 1 - 10
of 21
pro vyhledávání: '"Mohammad Reisi-Nafchi"'
Publikováno v:
International Journal of Industrial Engineering and Production Research, Vol 33, Iss 2, Pp 1-21 (2022)
Operating rooms have become the most important areas in hospitals because of the scarcity and cost of resources. The present study investigates operating room scheduling and rescheduling considering the priority of surgical patients in a specialized
Externí odkaz:
https://doaj.org/article/0a4c7d15d6fe491d96527f81ccc23834
Publikováno v:
EURO Journal on Computational Optimization, Vol 11, Iss , Pp 100052- (2023)
Given that about half of the produced energy in the world is consumed in industries, there has been an increasing concern about optimizing energy consumption in manufacturing sectors. As one of the most effective ways, proper production scheduling to
Externí odkaz:
https://doaj.org/article/433e931a05794d5fa841b6b557601ef9
Publikováno v:
International Journal of Industrial Engineering Computations, Vol 9, Iss 3, Pp 289-306 (2018)
In recent years, many studies on the multi-agent scheduling problems in which agents compete for using the shared resources, have been performed. However, relatively few studies have been undertaken in the field of the multi-agent scheduling in a flo
Externí odkaz:
https://doaj.org/article/478ebdee87e94127b3741df54fc0f068
Publikováno v:
مدیریت تولید و عملیات, Vol 8, Iss 1, Pp 79-100 (2017)
In competitive markets, attracting potential customers and keeping current customers is a survival condition for each company. So, paying attention to the requests of customers is important and vital. In this paper, the problem of order acceptance an
Externí odkaz:
https://doaj.org/article/8baa99a6a05a40d186e608539f60e420
Publikováno v:
Networks. 81:359-377
Publikováno v:
Applied Mathematical Modelling. 109:775-796
Publikováno v:
European Journal of Operational Research. 299:706-721
This paper introduces a complex real-world problem on a large scale that combines the split delivery heterogeneous vehicle routing problem with three-dimensional loading and considers new routing and loading constraints. The problem aims to find a se
Publikováno v:
Ravish/hā-yi ̒adadī dar Muhandisī, Vol 39, Iss 1, Pp 105-133 (2020)
Scheduling in production environments is used as a competitive tool to improve efficiency and respond to customer requests. In this paper, a scheduling problem is investigated in a three-stage flexible flowshop environment with the consideration of b
Publikováno v:
Operational Research. 22:1403-1442
In the past decade, multi-agent scheduling studies have become more widespread. However, the evaluation of these issues in the flow shop scheduling environment has received almost no attention. In this article, we investigate two problems. One proble
Publikováno v:
Journal of Scheduling. 23:265-288
The decisions in the operating room scheduling process related to the case mix planning, the master surgery schedule and the nurse roster are based on the expected demand, predicted by historical data. Patients are only scheduled in the operational p