Zobrazeno 1 - 10
of 22
pro vyhledávání: '"Mohammad M. AlDurgam"'
Publikováno v:
IEEE Access, Vol 9, Pp 126774-126788 (2021)
Oil and gas supply chain (SC) plays key role in the global economy. Gas and oil separation plants (GOSP) belong to the upper stream of the oil and gas SC. In this article we study a GOSP that pumps oil to a stabilizing plant through a 600 KM pipeline
Externí odkaz:
https://doaj.org/article/abf91e5b70714e11b8d439f13336ff82
Autor:
Mohammad M. Aldurgam
Publikováno v:
IEEE Access, Vol 8, Pp 105645-105658 (2020)
Over the past 20 years, integrated decision making for production systems has gained the interest of researchers and practitioners. Many studies have shown that integrated decision making can lead to substantial amount of savings. Yet, a few research
Externí odkaz:
https://doaj.org/article/ae372c5c08bf4016a3bc01f90f57c42d
Publikováno v:
IEEE Access, Vol 7, Pp 40230-40239 (2019)
To maximize profitability and meet customers' expectations, assembly plants strive to enhance operations and minimize costs. Using discrete-event system simulation and optimization, this paper investigates different scenarios to enhance operations ef
Externí odkaz:
https://doaj.org/article/c33d9b711a6f42c79a54061b4b50afdf
Autor:
Mohammad M. AlDurgam, Firas M. Tuffaha, Mohammad A. M. Abdel-Aal, Yasser Almoghathawi, Haitham H. Saleh, Zead Saleh
Publikováno v:
IEEE Transactions on Engineering Management. :1-24
Publikováno v:
Environmental Science and Pollution Research International
The novel coronavirus (COVID-19) outbreak has left a major impact on daily lifestyle and human activities. Many recent studies confirmed that the COVID-19 pandemic has human-to-human transmissibility. Additional studies claimed that other factors aff
Publikováno v:
IEEE Access, Vol 9, Pp 126774-126788 (2021)
Oil and gas supply chain (SC) plays key role in the global economy. Gas and oil separation plants (GOSP) belong to the upper stream of the oil and gas SC. In this article we study a GOSP that pumps oil to a stabilizing plant through a 600 KM pipeline
Autor:
Mohammad M. AlDurgam, Sameh Al-Shihabi
Publikováno v:
Frontiers of Engineering Management. 7:223-237
The finance-based scheduling problem (FBSP) is about scheduling project activities without exceeding a credit line financing limit. The FBSP is extended to consider different execution modes that result in the multimode FBSP (MMFBSP). Unfortunately,
Autor:
Sameh Al-Shihabi, Mohammad M. AlDurgam
Publikováno v:
International Transactions in Operational Research. 27:2841-2877
Publikováno v:
IEEE Access. 7:40230-40239
Autor:
Mohammad M. AlDurgam
Publikováno v:
IFAC-PapersOnLine. 52:2792-2797
In the literature on inventory models, it is common to assume fixed production rates. However, in some cases, such as flexible production systems, this assumption is not realistic. In contrast, variable production rate models rarely define the mechan