Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Mohamed Idris Ben Fayed"'
Autor:
Devesh Bhaisora, Ahmed Morsy, Mohamed Idris Ben Fayed, Khaled El-Sawah, Wilco Geldof, Akshin Mehdiyev
Publikováno v:
Day 2 Tue, September 15, 2015.
An operator spudded an extreme high-pressure/high-temperature (eHP/HT) well in the Mediterranean Sea, offshore Egypt, in 2012. To achieve the well objectives, it was necessary to set 28-in. surface casing at 1183 m, which was the deepest casing point
Autor:
Sherif Ali Mohtady Mohamed, Devesh Bhaisora, Landon Hollman, Mohamed Idris Ben Fayed, Ahmed Fathy Awad, Wilco Geldof, Akshin Mehdiyev
Publikováno v:
Day 2 Tue, September 15, 2015.
The adequate cementation of an expandable tubular can be challenging but is essential for long-term casing integrity. Such cementing jobs are especially crucial under high-pressure/high-temperature (HP/HT) conditions for many reasons, including but n
Autor:
Inam Haq, Landon Hollman, Mohamed Idris Ben Fayed, Wilco Geldof, Thiago Pinheiro da Silva, Clayton Christenson, Nigel Thorn
Publikováno v:
Day 1 Tue, March 17, 2015.
The implementation of Managed Pressure Drilling (MPD) equipment into a drilling operation or rig integration requires planning to establish appropriate procedures, guidelines, training, familiarization, as well as equipment placement and modification
Autor:
Mohamed-Idris Ben-Fayed, Landon Hollman, Devesh Bhaisora, Akshin Mehdiyev, Syed Arshad Waheed, Wilco Geldof, Mohamed Abdel Gawad
Publikováno v:
All Days.
Curing losses during drilling is a widely known and discussed topic. Losses are mainly cured by spotting a lost circulation pill from the mud company or by spotting and squeezing a lost circulation cement plug. Many papers have been published regardi