Zobrazeno 1 - 5
of 5
pro vyhledávání: '"Mirkhat Aitkazin"'
Publikováno v:
Day 2 Thu, November 02, 2017.
Petroleum Experts Integrated Production Modeling (IPM) toolkit is widely used in Tengizchevroil (TCO) for short and long term production forecasting in the Tengiz field. The short and long term models each have their own strategic focus. The short te
Autor:
Alvaro Rey, Kok-Thye Lim, Baurzhan Kassenov, Berik Urazmukhambetov, Mirkhat Aitkazin, Dauren Kurimov, Danny Rojas, Amirbek Kairbekov
Publikováno v:
Day 2 Thu, November 02, 2017.
Due to its complex nature, long term development scenarios have been modeled using a subsurface reservoir centric model, with representative surface constraints such as well head pressure. Near term operating plans, on the other hand, have been based
Autor:
Dauren Kurimov, Kok-Thye Lim, Berik Urazmukhambetov, Amirbek Kairbekov, Danny Rojas, Baurzhan Kassenov, Mirkhat Aitkazin, Alvaro Rey
Publikováno v:
SPE Annual Caspian Technical Conference and Exhibition.
Publikováno v:
SPE Annual Caspian Technical Conference and Exhibition.
Publikováno v:
All Days.
Abstract Integrated Production Modeling (IPM) is probably the most popular suite of software for production optimization and planning. It affords the opportunity to model the entire production system from the reservoir through the surface gathering s