Zobrazeno 1 - 9
of 9
pro vyhledávání: '"Mior Yusni Ahmad"'
Autor:
Azfar Israa Abu Bakar, Amir Badzly M Nazri, Pranay Shankar, Nor Arina M Azam, Aida Nor Hidayah Abu Bakar, Nor Azman Che Mahmood, Zairi A Kadir, Zayful Hasrin Kamarudzaman, Mior Yusni Ahmad, Ibrahim Subari, Ahmad Idriszuldin Ridzuan, Norhayati M Sahid, Chee Seong Tan, Nicholas Moses, Zhen-Xuan Yew, Agnes Tan, Gordon Goh
Publikováno v:
Day 1 Wed, March 01, 2023.
In Q4 2017, the first extended-reach horizontal oil producer was completed in S-Field, with the horizontal section designed with nine isolation compartments with swellable packers. Each compartment was configured with an inflow control device (ICD) a
Autor:
Ainul Azuan Masngot, Suman Kumar, Nurul Iffah M Garib, Mior Yusni Ahmad, Juhari Yang, Tunku Ahmad Farhan Tunku Kamaruddin, Mohd Zubair Mohd Azkah, Abd Hakim Basri
Publikováno v:
Day 2 Wed, August 10, 2022.
A 500m open hole horizontal well with 2 segmented sections was completed with Single Trip Completion with RFID technology in July 2021. This is the first application in Petronas asset which resulted into 21% of cost saving in well completion element
Autor:
Syarifah Puteh Mariah Syed Abd Rahim, Mohd Fairuz Azman, Zaidi Awang@Mohamed, Mior Yusni Ahmad
Publikováno v:
Day 4 Fri, March 25, 2022.
Marginal field development commonly face setback when it comes to an investment decision, which makes it technically and commercially very challenging to be developed. Technologies that usually applied in big fields may not be economically relevant t
Autor:
Syarifah Puteh Mariah Syed Abd Rahim, Mohd Fairuz Azman, Zaidi Awang@Mohamed, Mior Yusni Ahmad Fuad
Publikováno v:
Day 2 Wed, March 23, 2022.
It is widely known that for highly corrosive environment, corrosion-resistance alloy (CRA) is recommended as the production tubing material. This is because its alternative, carbon steel (CS) is prone to corrosion that leads to integrity issues such
Autor:
Adhi Naharindra, Zalina Ali, Nik Fazril Ain Sapi’an, Latief Riyanto, Fuziana Tusimin, Mior Yusni Ahmad, Mior Zaiga Sariman, Dolores Sarical, Nurbaiti Baharuddin
Publikováno v:
Day 3 Wed, November 17, 2021.
Increased HSE concerns and global economic efficiency from well testing activities especially on its environmental impact have left several oil and gas industries’ facing critical challenges to develop and monetize oil reserves. Some of these chall
Autor:
Tengku Zuhaili Tengku Yahya, Ainul Azuan Masngot, M. Amri M. Diah, Nurul Iffah M. Garib, Hasyimah Ghazali, Izzuddin Jamaludin, Mior Yusni Ahmad, Coates Iain D
Publikováno v:
Day 1 Tue, March 23, 2021.
Field development for brownfields nearing their economic thresholds is always challenging, especially in offshore environments. As an operator, innovative approaches are necessary to reduce capital expenditures (CAPEX) and create attractive projects.
Autor:
M. Shahnizam Khairuddin, Mior Yusni Ahmad, Suria Melanie Mohammad, Zulkifli Mohammad Zin, Maziah A. Manaf, Lola Le Dang, Bee Ching Yap, Shaiful Helmi Shafie
Publikováno v:
Day 3 Wed, November 04, 2020.
Challenges associated with horizontal wells production in a barefoot or only standalone screen are well documented in the industry. Inflow control devices have been around for years and have been the answer to mitigate the challenges typically associ
Autor:
Mohd Ramziemran Abdul Rahman, Dahlila Kamat, Zairi Kadir, Jorge Maldonado, Thierry Chabernaud, Ramli Ibrahim, Bahrom Madon, Sanggeetha Kalidas, Nur Faizah P Mosar, Prashanth Nair Kumaran, Kim Fah Gordon Goh, Adam Hareezi A Aziz, Joel Gil, Chee Seong Tan, Kulapat Watana, Tomaso U. Ceccarelli, Ahmad Syahrir Hatta Mohd Salim, Zhang Lei Min, Mior Yusni Ahmad, Mohd Faizatulizuddin Ishak
Publikováno v:
Day 2 Wed, October 24, 2018.
The first horizontal oil well was drilled through an anticline structure in the Block-7E of East Flank, S-field, penetrating three production sands Sand I, Sand II and Sand III. Based on a comprehensive pre-drill study through steady-state and 3D dyn
Autor:
M Aminuddin Karim, David George Fyfe, Jayachand Patcha, M Al Fatah Zakariyah, Amir Shah Hamza, Justin Azlan Ham, Mior Yusni Ahmad
Publikováno v:
Day 1 Tue, October 17, 2017.
This paper discusses the smart Drill Stem Test (DST) string, run for a Deep Water (DW) well test operation, which enabled considerable saving of rig time, reduced risks, and provided best reservoir data quality, while performing a commingled DST in a