Zobrazeno 1 - 5
of 5
pro vyhledávání: '"Milton Phenneger"'
Publikováno v:
SpaceOps 2010 Conference.
On 2007/338, a series of attitude control thruster leaks began on the B-string of the GOES-12 spacecraft. Initial anomaly response to these leaks were hampered by a latch valve cross connect. These leaks continued off and on until 2009/136, and also
Publikováno v:
GOES-8 and Beyond.
Fourteen days of sounder observations were scheduled during the GOES-9 post launch test to perform an inflight measurement of the effects of IR radiance variations in the stratosphere on altitude control using the GOES Type II IR Earth Sensor. Two 16
Autor:
Milton Phenneger, Jennifer L. Knack
Publikováno v:
GOES-8 and Beyond.
The GOES-8 and -9 Sun analog sensor (SAS) flight data is analyzed to evaluate the attitude motion environment of payloads mounted on the solar array. The work was performed in part to extend analysis in progress to support the solar x-ray imager to b
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.