Zobrazeno 1 - 10
of 33
pro vyhledávání: '"Mikić Miomir"'
Autor:
Jovanović Ivan, Tašić Dušan, Mikić Miomir, Presburger-Ulniković Vladanka, Staletović Novica, Nikolić Violeta
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2024, Iss 1, Pp 45-50 (2024)
Atmospheric pollution at the open pits depends on the annual production and intensity of emissions the harmful gases and dust, that is, development the individual phases in overburdening and obtaining the useful mineral resources. The gas and dust em
Externí odkaz:
https://doaj.org/article/33ff0c54c3b645e5919c06b1d76834a4
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2023, Iss 1, Pp 1-6 (2023)
Today, there is a large number of software in which various mathematical algorithms for optimization the open pits are implemented. However, the importance of experience of the mining engineers in planning is still crucial for the quality of mining p
Externí odkaz:
https://doaj.org/article/185b93e1247a404b9458a00cb8cb47bf
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2023, Iss 2, Pp 9-16 (2023)
The lead and zinc ore are expected to be mined at the open pits Žuta Prla and Brskovo near Mojkovac, Montenegro. During ore mining and flotation processing, the waste from the open pits and tailings from pre-concentration (DMS) and flotation tailing
Externí odkaz:
https://doaj.org/article/563369e834384f48958e06d39e60285d
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2022, Iss 2, Pp 27-34 (2022)
The "Landfill 3" was formed at the location of the flotation tailing dump "Čukaru Peki", where the earthen material, created during the dam construction of the flotation tailing dump was placed. A part of the deposited material and substrate at this
Externí odkaz:
https://doaj.org/article/3544b63dcf3b468aa9ca54e2cdaf0183
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2021, Iss 1-2, Pp 63-74 (2021)
Using the methods of AHP, VIKOR and TOPSIS, the methodology of ore deposit selection was determined. Selection of the best deposit is presented, as well as a comparative analysis of the output values of the applied methods.
Externí odkaz:
https://doaj.org/article/d2eb23ebc46b49e68182c91aeb8a2f91
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2019, Iss 3-4, Pp 21-28 (2019)
The development of mining operations at the South Mining District Open Pit of the Copper Mine Majdanpek is conditioned in the following short term by removal the accumulated water, sludge and sediment from the inactive water collector from the level
Externí odkaz:
https://doaj.org/article/8ce3ffbd602c4973a25df759bef1c439
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2019, Iss 1-2, Pp 9-18 (2019)
The existing dam "Prevoj Šaška" is located on the active flotation tailing dump "Valja Fundata" in Majdanpek. Since there is no valid documentation for the current maximum height of dam K+538 m, and disposal of tailings into this landfill is contin
Externí odkaz:
https://doaj.org/article/e0ce3602f5aa465caa10925438bb02ac
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2018, Iss 1-2, Pp 61-68 (2018)
The existing landfill at the site 'Maljevac' is still active and it should provide the additional space for ash and slag disposal and continue the exploitation period as long as possible. For these purposes, in the licensed GEMS and Minex software, t
Externí odkaz:
https://doaj.org/article/b149fbdfb16d448688e59ba2d689ff9d
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2018, Iss 1-2, Pp 17-26 (2018)
The existing landfill at the site 'Maljevac' is still active and should provide the additional space for ash and slag disposal in the following period. For these purposes, the stability analysis of the existing landfill condition, as well as the stab
Externí odkaz:
https://doaj.org/article/6626053671ec4075a9063cc01417865a
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2017, Iss 1-2, Pp 35-40 (2017)
In order to provide better and easier loading of useful component and overburden, the drilling and blasting belong to the important work operations at the open pits. Borehole drilling represents a source of harmful respirable mineral dust beside the
Externí odkaz:
https://doaj.org/article/498fa4e835d24eaca62d30662fe45d14