Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Meghdad Attarzadeh"'
Publikováno v:
Advanced Engineering Informatics. 33:112-131
Fuzzy and hybrid methods have been increasingly used in construction risk management research and this study aims to compile and analyse the basic concepts and methods applied in this field to date. A content analysis is made of a comprehensive liter
Publikováno v:
Construction Management and Economics
The success of public–private partnership (PPP)–build–operate–transfer (BOT) projects largely depends on effectively mitigating the impact of a variety of risks and uncertainties, especially those influencing the revenue over time. Revenue in
Publikováno v:
Automation in Construction. 54:54-68
Building Information Modelling (BIM) has been identified as a key computer aided technology that facilitates construction productivity enhancements through the elimination of various construction inefficiencies. Identifying these inefficiencies, thei
Publikováno v:
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
The conventional simulation model used in the prediction of long-term infrastructure development systems such as public–private partnership (PPP)–build-operate-transfer (BOT) projects assum...
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::8b68c41b9ced366bf98ed11daac66903
Autor:
Chua David K H, Meghdad Attarzadeh
Publikováno v:
Proceedings of the 2011 (2nd) International Conference on Engineering, Project, and Production Management.
Estimation and forecasting are critical functions of project control and management especially in long term infrastructure PPP-BOT projects. Reliable estimation and forecasting enables the PPP-BOT project manager to make better informed decisions for
Publikováno v:
Vulnerability, Uncertainty, and Risk.
Nowadays, in the areas that are encountered with drinking water shortage, contiguity of sea with land create a facility to change salty water to drinking water using desalination plant and reverse osmosis method. The first desalination project of Ira
Publikováno v:
Vulnerability, Uncertainty, and Risk.
Risk Management is one of the vital factors for success in long term projects. According to some researchers which consider the risks in long term and large structures projects, risk management is the order of the day and one of the critical success