Zobrazeno 1 - 9
of 9
pro vyhledávání: '"Md. Yusof Ismail"'
Publikováno v:
Jurnal Teknologi. 84:11-25
Despite the fact that Malaysian manufacturing firms have implemented lean manufacturing principles to reduce resource waste and focus on customer demand, they still lack statistically validated lean manufacturing models to guide them in enhancing the
Publikováno v:
Key Engineering Materials. 908:621-625
Owing to the inability of waste concrete to be recycled, unlike aluminium or glass, it is one of the most harmful substances to the environment. Thus, most of the waste concrete was poured in every available space, resulting in environmental contamin
Autor:
Teddy Surya Gunawan, Haque Mohammad Reduwan, Mashkuri Yaacob, Nor Fadhillah M. Azmin, Nanang Ismail, Md Yusof Ismail, Mira Kartiwi, Azhar A. Rahman
Publikováno v:
2022 IEEE 8th International Conference on Computing, Engineering and Design (ICCED).
Publikováno v:
International Journal of Business Excellence. 1:1
Publikováno v:
International Journal of Productivity and Quality Management. 38:332
Publikováno v:
International Journal of Productivity and Quality Management. 1:1
Publikováno v:
International Journal of Productivity and Quality Management. 1:1
Publikováno v:
Lecture Notes in Mechanical Engineering ISBN: 9789811509490
In the production line, productivity is the key towards maximum efficiency. Time study is the technique of establishing an allowed time standard to perform a given task based on the prescribed method. This study employs the use of a time study to mea
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::e7287977cd79dafbbbe35182f9cc0d80
https://doi.org/10.1007/978-981-15-0950-6_21
https://doi.org/10.1007/978-981-15-0950-6_21
Publikováno v:
International Journal of Knowledge and Learning. 13:10