Zobrazeno 1 - 10
of 28
pro vyhledávání: '"Masoud Zare Naghadehi"'
Autor:
Rushikesh Battulwar, Garrett Winkelmaier, Jorge Valencia, Masoud Zare Naghadehi, Bijan Peik, Behrooz Abbasi, Bahram Parvin, Javad Sattarvand
Publikováno v:
Remote Sensing, Vol 12, Iss 14, p 2283 (2020)
High-resolution terrain models of open-pit mine highwalls and benches are essential in developing new automated slope monitoring systems for operational optimization. This paper presents several contributions to the field of remote sensing in surface
Externí odkaz:
https://doaj.org/article/685eeef4da1c4a7eb78df92527fbd4c1
Publikováno v:
International Journal of Mining and Geo-Engineering, Vol 49, Iss 1, Pp 19-32 (2015)
This paper tries to determine an optimum condition for the flotation operation of the Alborz-Sharghi coal washing plant. For this purpose, a series of comprehensive experiments have been conducted on representative samples from feed of the flotation
Externí odkaz:
https://doaj.org/article/970ac99138c44f35bc91cc4d4e4d40dd
Publikováno v:
International Journal of Mining, Reclamation and Environment. 34:531-561
A new rock burst damage scale index (RDSI) based on the Rock Engineering Systems paradigm and on a BP-ANN is proposed. Seven parameters that are likely to affect rock burst damage are considered to...
Autor:
Garrett Winkelmaier, Rushikesh Battulwar, Javad Sattarvand, Bahram Parvin, Behrooz Abbasi, Jorge Valencia, Masoud Zare Naghadehi, Bijan Peik
Publikováno v:
Remote Sensing; Volume 12; Issue 14; Pages: 2283
Remote Sensing, Vol 12, Iss 2283, p 2283 (2020)
Remote Sensing, Vol 12, Iss 2283, p 2283 (2020)
High-resolution terrain models of open-pit mine highwalls and benches are essential in developing new automated slope monitoring systems for operational optimization. This paper presents several contributions to the field of remote sensing in surface
Publikováno v:
Advances in Visual Computing ISBN: 9783030645588
ISVC (2)
ISVC (2)
Measurement of joint orientation is an essential task for rock mass discontinuity characterization. This work presents a methodology for automatic extraction of joint orientations in a rock mass from 3D point cloud data generated using Unmanned Aeria
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::655130b1562519a0f35df8ef7ce8157b
https://doi.org/10.1007/978-3-030-64559-5_57
https://doi.org/10.1007/978-3-030-64559-5_57
Autor:
Sadegh Tarigh Azali, Shokrollah Zare, Rafael Jimenez, Emad Khorasani, Masoud Zare Naghadehi, Seyed-Mohammad Esmaeil Jalali
Publikováno v:
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. 171:422-438
In this paper, the performance of an earth pressure balance tunnel-boring machine (EPB-TBM) during tunnel construction is analysed. A case study with data from the east–west part of the Tehran metro line 7 is employed to develop a methodology. Seve
Publikováno v:
Measurement. 126:46-57
Hard rock TBM performance prediction is of great interest to the tunneling community on account of its importance in time and cost risk management of underground projects. Continuous development of new empirical models in recent decades reveals the i
Publikováno v:
Geotechnical and Geological Engineering. 36:1779-1804
This paper presents an extended multifactorial fuzzy evaluation of hard rock tunnel boring machine performance. Several modifications have been applied to an earlier work of the authors team in 2009 to capture better prediction capabilities of TBM pe
Autor:
Masoud Zare Naghadehi, Reza Mikaeil, Sami Shaffiee Haghshenas, Pedram Sirati Moghadam, Sina Shafiee Haghshenas
Publikováno v:
Civil Engineering Journal. 3:382-394
Slope stabilization is one of the most crucial tasks in rock-fill reservoir dam projects to prevention of erosion and destruction of upstream and downstream slopes. Inappropriate choice and design of the protection can cause irreparable damages impos
Publikováno v:
Bulletin of Engineering Geology and the Environment. 76:1627-1641
The risk of excavation operations due to high capital costs can be reduced by correct estimation of machine performance. Many models have been proposed to study this issue, but considering the nature of the problem, it is rather difficult to estimate