Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Mashanim Mahazir"'
Autor:
Mashanim Mahazir, Ji Yung Loo, Mohd Farhan Mohd Nasir, Noor Hidayah Elmi, Eunice Chia Mei Ling
Publikováno v:
Journal of Engineering & Technological Advances. 7
This project is carried out to study the evaluation of influencing factors for sustainable development with intelligent building systems in private universities in Klang Valley. An intelligent building system can be defined as a building automation s
Publikováno v:
Journal of Engineering & Technological Advances. 5:19-33
The rising innovations of technologies, some companies have developed greed towards owning as many projects as possible. Those involved think that they are the only ones who should be handling complex works as they are the only ones who have the righ
Autor:
Puah Kar Ros, Mashanim Mahazir
Publikováno v:
Journal of Engineering & Technological Advances. 5:8-21
The construction industry believes that Building Information Modelling (BIM) are able to reduce the problem faced by the infrastructure world. Nowadays, the construction industry faced many problems due to dependency on the traditional practice. Ther
Autor:
Mashanim Mahazir
Publikováno v:
Journal of Engineering & Technological Advances. 3:71-83
In the construction industry plant and equipment one of the important and main sources is to increase productivity of the project. To keep available the plant and equipment need all of technical, administrative, managerial action during the whole lif
Autor:
Mashanim Mahazir, Bedri Yasmin
Publikováno v:
Journal of Engineering & Technological Advances. 1:95-103
The Malaysian construction industry is responsible for producing a huge amount of structural reinforcement bar wastes which has a major impact on the environment, the society and economy. Thus, the minimization of reinforcement bar waste has become a
Autor:
Mashanim Mahazir
Publikováno v:
Proceedings of the Colloquium on Administrative Science and Technology ISBN: 9789814585446
Accuracy in industrialised building system (IBS) installation is vital; therefore, a comprehensive training model is needed to ensure that Malaysian contractors embrace the system. Purpose, methodology and approach are based on the combination of lit
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::afb3adddaad2509dd1460b704e315374
https://doi.org/10.1007/978-981-4585-45-3_39
https://doi.org/10.1007/978-981-4585-45-3_39