Zobrazeno 1 - 10
of 237
pro vyhledávání: '"Marcello Braglia"'
Publikováno v:
Production and Manufacturing Research: An Open Access Journal, Vol 12, Iss 1 (2024)
ABSTRACTThe paper presents a new Lean Logistics tool specifically designed for Engineer and Design-To-Order (ETO and DTO) industrial environments. The new tool, namely Plan For Every Order (PFEO), conceptually derives from the well-known Plan For Eve
Externí odkaz:
https://doaj.org/article/1d7352c5ee704c89805292893552e6dd
Autor:
Marcello, Braglia, Davide, Castellano, Marco, Frosolini, Roberto, Gabbrielli, Leonardo, Marrazzini, Luca, Padellini
Publikováno v:
In Procedia Manufacturing 2020 42:41-48
Publikováno v:
Designs, Vol 6, Iss 2, p 23 (2022)
This paper aims to provide a case study related to two small and medium-sized enterprises (SMEs) of the Italian footwear supply chain, comparing sales and production data from pre-pandemic years with those affected by the COVID-19 (SARS-CoV-2) pandem
Externí odkaz:
https://doaj.org/article/385794de138d486cb101e188ebe466d8
Publikováno v:
The International Journal of Advanced Manufacturing Technology.
The ability of companies to rapidly conduct a changeover from one product to another as part of a production process is a fundamental step towards a more flexible production system that can deal with an increasingly dynamic and competitive market. Si
Publikováno v:
International Journal of Productivity and Performance Management.
PurposeThis paper proposes a new metric, named Operational Space Efficiency (OpSE), intended to diagnose and quantify the inefficient use of floor space for stocking materials in industrial workstations. OpSE presents a formulation analogous to the w
Publikováno v:
Designs, Vol 5, Iss 1, p 12 (2021)
The purpose of this paper is to propose a novel process failure mode and effect analysis (PFMEA) approach for the reliable design of assembly activities to prevent product defects due to errors during the assembly of complex products. PFMEA is approa
Externí odkaz:
https://doaj.org/article/c9911cb8398042aba6bd287e41d5de87
Publikováno v:
Production Planning & Control. 33:1061-1077
COntrol of BAlance by CArd-BAsed NAvigation (COBACABANA) is a card-based system for job shop control. This paper presents a real industrial application of COBACABANA aimed at solving production con...
Publikováno v:
Production Planning & Control. 33:925-942
Construction projects are often unique, time-limited and require a high degree of customization by involving a significant number of Engineer-to-Order (ETO) components. Usually, ETO construction su...
Publikováno v:
International Journal of Productivity and Performance Management. 70:1317-1335
PurposeThe paper proposes a new workforce effectiveness metric that is a sophisticated evolution of a pre-existing overall labour effectiveness (OLE) indicator. The KPI, named revised OLE (ROLE), provides a structured methodology to measure in a holi
This paper presents a novel lean tool called Project Time Deployment (PTD) whose objectives are to classify, analyse, and eliminate losses in order to reduce production lead time in Engineer-to-Ord...
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::eb52b928fac692242ae9d5c6a13bc983
http://hdl.handle.net/11568/1144220
http://hdl.handle.net/11568/1144220