Zobrazeno 1 - 10
of 16
pro vyhledávání: '"Mahmoud Elgizawy"'
Publikováno v:
Day 3 Thu, March 09, 2023.
A survey program is designed for every well drilled to meet the well objective of penetrating the target reservoir and avoiding colliding with other offset wells. The selection of the wellbore survey tools within the survey program is limited in numb
Publikováno v:
Day 2 Tue, November 01, 2022.
Drilling wells in close proximity to offset wells always involves a collision risk. This could lead to a catastrophic event like a blowout if collision avoidance monitoring techniques fail. None of the existing collision avoidance techniques today in
Publikováno v:
Day 3 Wed, October 05, 2022.
Definitive dynamic 6 axis surveys provide continuous MWD quality measurement while drilling. This poses a challenge in terms of misalignment (relative to the borehole) correction when compared to traditional static survey measurements where misalignm
Autor:
John Adam Donald, Mahmoud Elgizawy, Jamie Dorey, Hans Dreisig, Edgar Velez Arteaga, Chris Cutts
Publikováno v:
Rio Oil and Gas Expo and Conference. 22:126-127
Definitive Dynamic MWD Surveys Generate Rig Time Savings and Flat Time Reductions in the Middle East
Publikováno v:
Day 2 Tue, November 16, 2021.
Wellbore surveying is a critical component of any well construction project. Understanding the position of a well in 3D space allows for the wells geological objectives to be carried out while safely avoiding other wellbores. Wellbore surveys are gen
Publikováno v:
Day 2 Wed, May 26, 2021.
Wellbore surveying is critical while drilling in order to assure the drilled well is following the plan and is penetrating the geological target. Additionally, wellbore surveying is the key to allowing a well to be drilled safely, avoiding other well
Publikováno v:
Day 4 Thu, November 12, 2020.
Wellbore surveying is essential to deliver the objectives of a well; it is, however, time-consuming, increases the risk of differential sticking, and due to its costs, may not often be done enough to describe the wellbore architecture adequately. Mea
Autor:
Mahmoud ElGizawy, Shadi Mussa, Konstantin Bulychenkov, Michael Edmunds, Ross Lowdon, Katerina Brovko, Michael Breen
Publikováno v:
Day 3 Wed, November 13, 2019.
The drilled wellbore is surveyed while drilling at stationary interval when drilling operation stops to connect a new stand. A next generation measurement while drilling MWD tool is developed to take a definitive survey while drilling either rotating
Publikováno v:
Day 2 Tue, January 30, 2018.
A survey program is designed for every well drilled to meet the well objective of penetrating the target reservoir and to avoid colliding with other offset wells. The selection of the wellbore survey tools within the survey program are limited to the
Autor:
Jamal Al Noukhatha, Saleel Koakkadan, Brad Hargreaves, Yousef Al Katheeri, Natalia Androsovich, Hakim Rachi, Mahmoud Elgizawy, Nashat Abbas
Publikováno v:
Day 3 Wed, November 15, 2017.
The objective for drilling development wells is to penetrate the target reservoir, maximize recovery, and ensure maximum production. Determining accurate true vertical depth (TVD) in real time is essential to achieving these objectives in thin reserv