Zobrazeno 1 - 10
of 1 041
pro vyhledávání: '"MULTI-PROJECT"'
Publikováno v:
Production and Manufacturing Research: An Open Access Journal, Vol 12, Iss 1 (2024)
ABSTRACTA Systematic Literature Review (SLR) on the Resource-Constrained Multi-Project Scheduling Problem (RCMPSP), Uncertainty, and Resource Flexibility (human resource) is presented in this study. The main purpose is to help scholars with an overvi
Externí odkaz:
https://doaj.org/article/25ae893d0ca6470caff69431190ce2c4
Publikováno v:
IJEBD (International Journal of Entrepreneurship and Business Development), Vol 7, Iss 4 (2024)
Purpose: Multi-project management of industrial facility construction has high challenges and complexity. Various factors influence the effectiveness and risks of multi-project implementation. A separate management method is required in implementing
Externí odkaz:
https://doaj.org/article/d867dc61d0204df89c2611c6ceef4a89
Publikováno v:
IEEE Access, Vol 12, Pp 155644-155653 (2024)
With the development of the national economy, a large number of small and medium-sized enterprises have rapidly expanded in scale, and their internal structures have become increasingly complex. Traditional single project management is no longer suit
Externí odkaz:
https://doaj.org/article/6b14db6115104d7fb2bf3ea8cec23012
Publikováno v:
IEEE Access, Vol 12, Pp 112729-112741 (2024)
Multiple projects are increasingly managed in a decentralized environment, resulting in an inapplicable centralized resource-constrained multi-project scheduling problem (CRCMPSP). A decentralized resource-constrained multi-project scheduling problem
Externí odkaz:
https://doaj.org/article/cf75f78b054649f28c6dd55f615343b5
Publikováno v:
IEEE Access, Vol 12, Pp 29204-29221 (2024)
With the rapid development of economic globalization and information technology, the projects undertaken by enterprises are gradually becoming larger and more complex. The multi-project management model has become the norm in enterprise management, a
Externí odkaz:
https://doaj.org/article/227257feca104a47bb85b7673f4ead6d
Autor:
Krisztián Mihály, Gyula Kulcsár
Publikováno v:
International Journal of Industrial Engineering and Management, Vol 14, Iss 4, Pp 326-335 (2023)
This paper proposes a new hybrid method to solve extended scheduling problems that can include multiple resources, projects, and tasks with specific attributes, relationships, and constraints, as well as many objective functions with individual optim
Externí odkaz:
https://doaj.org/article/5701c6347fd24548ad57377d0ed3d189
Autor:
Zhang, Junguang, Han, Qing
Publikováno v:
Kybernetes, 2022, Vol. 52, Issue 10, pp. 4668-4685.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/K-11-2021-1147
Autor:
Guan Zhaoxin
Publikováno v:
Applied Mathematics and Nonlinear Sciences, Vol 9, Iss 1 (2024)
Strengthening the management of science and technology resources and improving the intensive management of science and technology resources is a shortcut for the development of traditional industries to informatization. This paper analyzes a series o
Externí odkaz:
https://doaj.org/article/04e6be5eb21646fe84518949d604d826
Autor:
Holland, Amanda
Publikováno v:
Strategic HR Review, 2022, Vol. 22, Issue 1, pp. 12-16.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/SHR-10-2022-0058
Publikováno v:
Engineering, Construction and Architectural Management, 2021, Vol. 30, Issue 1, pp. 321-363.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-07-2019-0384