Zobrazeno 1 - 10
of 62
pro vyhledávání: '"MAURIZIO BOCCI"'
Publikováno v:
Infrastructures, Vol 8, Iss 1, p 8 (2022)
Hot recycling of reclaimed asphalt pavement (RAP) into new hot-mix asphalt (HMA) is a complex process that must be precisely calibrated in the asphalt plants. In particular, temperature is a key parameter that, if inadequately set, can affect the fin
Externí odkaz:
https://doaj.org/article/3c2bd623a1c74aaf9c85a66847791cba
Publikováno v:
Advances in Materials Science and Engineering, Vol 2020 (2020)
The development of non‐black asphalt mixtures for surface courses may play a significant role to improve functional, aesthetic and environmental issues of road pavements. Nowadays, the development of clear binders as substitutes for traditional bit
Externí odkaz:
https://doaj.org/article/935921a9637c4b83b67d3405d6410b33
Publikováno v:
Road Materials and Pavement Design. 23:2798-2817
Publikováno v:
Sustainability; Volume 14; Issue 15; Pages: 9677
Heavy traffic loads require the replacement of damaged pavements, so a huge amount of reclaimed asphalt pavement (RAP) material is now available and must be recycled in order to avoid landfill and to achieve both environmental and economic benefits.
Publikováno v:
Road Materials and Pavement Design. 22:S214-S231
In recent years, over-stabilized polymer-modified bitumen emulsions have been widely used to improve the mechanical properties of cold bituminous mixtures. However, the effect of the polymer modifi...
Publikováno v:
Materials; Volume 16; Issue 1; Pages: 310
In recent years, both dry and wet processes to include waste rubber (WR) in bituminous mixtures have had little success in Italy due to technical and economic reasons. However, the necessity to recycle this waste material and the increasing interest
Publikováno v:
Construction and Building Materials. 361:129679
Publikováno v:
Sustainability, Vol 12, Iss 8612, p 8612 (2020)
Sustainability
Volume 12
Issue 20
Sustainability
Volume 12
Issue 20
In road construction, it can happen that, for different reasons, the time between hot-mix asphalt (HMA) production and paving is extended to some hours. This can be reflected in several problems such as mix cooling and temperature segregation, but al
Publikováno v:
Construction and Building Materials. 136:474-481
In the last few decades, highway agencies and the paving companies have invested huge efforts on increasing the amount of reclaimed asphalt (RA) to be introduced in the production of new asphalt concrete (AC). This technique, so-called hot recycling
Publikováno v:
Advances in Materials Science and Engineering, Vol 2020 (2020)
The development of non‐black asphalt mixtures for surface courses may play a significant role to improve functional, aesthetic and environmental issues of road pavements. Nowadays, the development of clear binders as substitutes for traditional bit