Zobrazeno 1 - 10
of 84
pro vyhledávání: '"MARIUSZ UCHROŃSKI"'
Publikováno v:
Applied Sciences, Vol 13, Iss 9, p 5304 (2023)
In many areas of the economy, we deal with random processes, e.g., transport, agriculture, trade, construction, etc. Effective management of such processes often leads to optimization models with random parameters. Solving these problems is already v
Externí odkaz:
https://doaj.org/article/028f6225c0d64542951b1f5198ecb863
Autor:
Łukasz Wawrowski, Andrzej Białas, Adrian Kajzer, Artur Kozłowski, Rafał Kurianowicz, Marek Sikora, Agnieszka Szymańska-Kwiecień, Mariusz Uchroński, Miłosz Białczak, Maciej Olejnik, Marcin Michalak
Publikováno v:
Sensors, Vol 23, Iss 6, p 2974 (2023)
It seems to be a truism to say that we should pay more and more attention to network traffic safety. Such a goal may be achieved with many different approaches. In this paper, we put our attention on the increase in network traffic safety based on th
Externí odkaz:
https://doaj.org/article/0324b23ace344a70ab043c14703f2ad0
Autor:
Mieczysław Wodecki, Mariusz Uchroński, Czesław Smutnicki, Jerzy W. Rozenblit, Jarosław Pempera, Ryszard Klempous, Wojciech Bożejko
This work has been submitted to the IEEE for possible publication. Copyright may be transferred without notice, after which this version may no longer be accessible. The main disadvantage of calculations on quantum computers is their non-determinism.
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::52223eefc58c2b27f17acc14eeca5609
https://doi.org/10.36227/techrxiv.22677721.v2
https://doi.org/10.36227/techrxiv.22677721.v2
Autor:
Mariusz Uchroński
Publikováno v:
Applied Sciences, Vol 11, Iss 5, p 2069 (2021)
In this paper, the weighted tardiness single-machine scheduling problem is considered. To solve it an approximate (tabu search) algorithm, which works by improving the current solution by searching the neighborhood, is used. Methods of eliminating ba
Externí odkaz:
https://doaj.org/article/d0df96f8d8b849dc979e63e52b237422
Autor:
MIROSŁAW KUPCZYK, MICHAŁ BIAŁOSKÓRSKI, RAFAŁ TYLMAN, KLEMENS NOGA, AGNIESZKA KWIECIEŃ, MARIUSZ UCHROŃSKI, NORBERT MEYER
Publikováno v:
TASK Quarterly, Vol 22, Iss 4 (2018)
The mission of the PRACE Research Infrastructure is to enable high impact scientific discovery and engineering research and development across all disciplines to enhance European competitiveness for the benefit of society. The paper presents the curr
Externí odkaz:
https://doaj.org/article/2f734c5d6812410aa4092926ec471ad5
Autor:
Mariusz Uchroński, Marcin Michalak, Andrzej Bialas, Rafał Kurianowicz, Adrian Kajzer, Łukasz Wawrowski, Marek Sikora
Publikováno v:
KES
Assuring the network traffic safety is a very important issue in a variety of today’s industries. Therefore, the development of anomalies and attacks detection methods has been the goal of analyses. In the paper the binary classification-based appr
Publikováno v:
Computational Science – ICCS 2022 ISBN: 9783031087592
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::17b960e7dec88f759dfa960a7bac7607
https://doi.org/10.1007/978-3-031-08760-8_15
https://doi.org/10.1007/978-3-031-08760-8_15
Publikováno v:
16th International Conference on Soft Computing Models in Industrial and Environmental Applications (SOCO 2021) ISBN: 9783030878689
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::870a21e0efa1d900d416f966a0964250
https://doi.org/10.1007/978-3-030-87869-6_72
https://doi.org/10.1007/978-3-030-87869-6_72
Publikováno v:
Journal of Civil Engineering and Management, Vol 20, Iss 5 (2014)
The paper concerns the problem of roadworks scheduling executed in the flow-shop system. Works may be performed parallelly with the acceleration (overlaps) of construction project, i.e. the following work on the assembly line can begin before the com
Externí odkaz:
https://doaj.org/article/cb5ef820243849b296b732f6ab386bbb
Publikováno v:
Computational Science – ICCS 2021 ISBN: 9783030779603
ICCS (1)
ICCS (1)
In the work we consider a job shop problem with due dates under conditions of uncertainty. Uncertainty is considered for operation execution times and job completion dates. It is modeled by normal and Erlang random variables. We present algorithms wh
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::4bb4c422725213a229a546dde7390642
https://doi.org/10.1007/978-3-030-77961-0_17
https://doi.org/10.1007/978-3-030-77961-0_17