Zobrazeno 1 - 10
of 60
pro vyhledávání: '"M.C. van der Heijden"'
Publikováno v:
European journal of operational research, 302(3), 983-998. Elsevier
We study performance improvement in multi-echelon, closed loop spare part supply chains using operational interventions based on real-time status information. Our objective is to minimize the total cost relevant costs, consisting of intervention cost
Publikováno v:
OR Spectrum, 43, 189-221. Springer
The low-volume spare parts business is often identified as a potential beneficiary of additive manufacturing (AM) technologies. Currently, high AM unit costs or low AM part reliabilities deem the application of AM economical inferior to conventional
Autor:
Engin Topan, M.C. van der Heijden
Publikováno v:
European journal of operational research, 284(1), 164-175. Elsevier
In this paper, we investigate operational spare parts planning in a multi-item two-echelon distribution system, taking into account real-time supply information in the system. We consider a broad range of operational interventions, either reactive (t
Publikováno v:
European Journal of Operational Research, 282, 401-414. Elsevier
In this paper, we provide an overview of operational spare parts planning in service control towers. We conduct company surveys to identify the issues, the challenges, and the needs in practice. We propose a classification framework to reveal the key
Publikováno v:
International journal of production economics, 181(Part A), 58-67. Elsevier
We study a multi-item, two-echelon, continuous-review inventory problem at a Dutch utility company. We develop a model for the optimal allocation of service parts in a two-echelon network under an aggregate waiting time constraint. Specific model asp
Publikováno v:
International journal of production economics, 197, 158-173. Elsevier
Spare part availability is essential for advanced capital goods with a long service period. Sourcing becomes challenging once the production of spare parts ceases, while the remaining service period is still long. In this paper, we focus on fast movi
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::6729780f18644ad277b109a030c972dd
https://research.utwente.nl/en/publications/972d45b5-d39c-4f61-a0af-21e711872cd3
https://research.utwente.nl/en/publications/972d45b5-d39c-4f61-a0af-21e711872cd3
Publikováno v:
European journal of operational research, 237(3), 824-835. Elsevier
European Journal of Operational Research, 237(3), 824-835. Elsevier
European Journal of Operational Research, 237(3), 824-835. Elsevier
We consider a multi-item spare parts problem with multiple warehouses and two customer classes, where lateral transshipments are used as a differentiation tool. Specifically, premium requests that cannot be met from stock at their preferred warehouse
Publikováno v:
Computers in industry, 113:103134. Elsevier
This study seeks to investigate when and how a transition to additive manufacturing (AM) becomes profitable for the low-volume spare parts business. As a starting point, we conducted a case study at an OEM of radar systems which foresaw various oppor
Publikováno v:
European journal of operational research, 244(2), 498-510. Elsevier
Original Equipment Manufacturers (OEM's) of advanced capital goods often offer service contracts for system support to their customers, for which spare parts are needed. Due to technological changes, suppliers of spare parts may stop production at so
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::f7be32f8a1ba4b16c0be6e6b0d11b285
https://research.utwente.nl/en/publications/54076138-0133-41b6-9b20-001a61cd8a1f
https://research.utwente.nl/en/publications/54076138-0133-41b6-9b20-001a61cd8a1f
Publikováno v:
European journal of operational research, 2005(167), 320-335. Elsevier
This paper presents a heuristic for the dynamic vehicle scheduling problem with multiple resource capacity constraints. In the envisaged application, an automated transport system using Automated Guided Vehicles, bottleneck resources are (1) vehicles