Zobrazeno 1 - 10
of 141
pro vyhledávání: '"M. Mathirajan"'
Autor:
M. Vimala Rani, M. Mathirajan
Publikováno v:
International Journal of Mathematical, Engineering and Management Sciences, Vol 6, Iss 6, Pp 1460-1486 (2021)
This study addresses a new problem on scheduling of nonidentical multiple diffusion furnaces (NMDF) with machine eligibility restriction (MER) along with important real-life problem characteristics such as multiple and incompatible job-families, diff
Externí odkaz:
https://doaj.org/article/35b26dcc9b0441ea8022f1d257f6ae49
Autor:
D., Prithvirajan, M., Mathirajan
Publikováno v:
Proceedings of the International Conference on Industrial Engineering & Operations Management; 2/12/2024, p854-861, 8p
Autor:
Rashmi Singh, M. Mathirajan
Publikováno v:
Journal of Simulation. :1-20
Autor:
T., Ragupathi, M., Mathirajan
Publikováno v:
Proceedings of the International Conference on Industrial Engineering & Operations Management; 9/12/2023, p496-504, 9p
Autor:
D, Prithvirajan, M, Mathirajan
Publikováno v:
Proceedings of the International Conference on Industrial Engineering & Operations Management; 9/12/2023, p403-409, 7p
Autor:
S. S. Sreejith, M. Mathirajan
Publikováno v:
South Asian Journal of Human Resources Management. 9:149-163
Although researchers recommend the continuous performance evaluation of employees (CPEE), literature is scant about a procedural framework for CPEE. This article aims to develop a simple and robust method for CPEE using the modified Pugh matrix metho
Autor:
D Prithvirajan, M Mathirajan
Publikováno v:
2022 International Conference on Engineering and Emerging Technologies (ICEET).
Publikováno v:
OPSEARCH. 59:102-145
This study presents an extensive experimental study of heuristic methods or initial basic feasible solution (IBFS) methods, which is one of the main steps to achieve an optimal or accepted (near-optimal) solution, for a transportation problem (TP). I
Autor:
M. Mathirajan, Rashmi Singh
Publikováno v:
IEEE Transactions on Semiconductor Manufacturing. 34:115-134
This article presents a new closed-loop release policy: Stage-Wise Control (SWC) that maintains the overall shop floor’s workload distributed into stages at a specified level by controlling the release of new jobs along the production line A simula
Publikováno v:
Operations Management Research. 13:233-248
Original Equipment Manufacturers (OEM) that assemble multiple durable products are actively engaged in adopting remanufacturing practices. This study addresses the introduction of a new business proposal, which is carrying out remanufacturing of comp