Zobrazeno 1 - 6
of 6
pro vyhledávání: '"M. H. Behzadi"'
Publikováno v:
Advances in Mathematical Physics, Vol 2021 (2021)
This article intends to review quasirandom sequences, especially the Faure sequence to introduce a new version of scrambled of this sequence based on irrational numbers, as follows to prove the success of this version of the random number sequence ge
Externí odkaz:
https://doaj.org/article/92a839ed1eeb43b4b54f640cf0ebd01c
Publikováno v:
بهداشت و ایمنی کار, Vol 5, Iss 2, Pp 23-34 (2015)
Introduction: According to previous researches, working at the airport is one of the most vociferous jobs in the world. Airport workers are at risk of noise induced hearing loss. The present study was done to evaluate the Sound Pressure Level (SPL) i
Externí odkaz:
https://doaj.org/article/c4a5b43ea4324b9bb9affc46017453bb
Publikováno v:
Advances in Operations Research, Vol 2016 (2016)
In order to get efficiency frontier and performance evaluation of portfolio, nonlinear models and DEA nonlinear (diversification) models are mostly used. One of the most fundamental problems of usage of nonlinear and diversification models is their c
Externí odkaz:
https://doaj.org/article/15113a1edd7c4960a34df53f19ec0afa
Publikováno v:
Acta Universitatis Sapientiae: Mathematica, Vol 13, Iss 2, Pp 413-426 (2021)
The bucket recursive tree is a natural multivariate structure. In this paper, we apply a trivariate generating function approach for studying of the depth and distance quantities in this tree model with variable bucket capacities and give a closed fo
Publikováno v:
Journal of Statistical Computation and Simulation. 89:1674-1693
The concept of loss function has been combined, with a numerous statistical decision models which require quality cost estimation. Moreover, estimation of the costs of non-conforming product is one...
Publikováno v:
Operational Research. 21:1041-1080
An economic-statistical model is developed for variable parameters $$(VP){\bar{X}}$$ control chart is developed in which the constraints are imposed on the expected times to signal when the process is out of control and the expected number of false a