Zobrazeno 1 - 10
of 36
pro vyhledávání: '"Luong, Duc Long"'
Autor:
Luong, Duc Long1,2 (AUTHOR), Truong, Ngoc-Son1,2,3 (AUTHOR) tnson.sdh19@hcmut.edu.vn, Ngo, Ngoc-Tri3 (AUTHOR), Nguyen, Ngoc-Quang3 (AUTHOR)
Publikováno v:
Scientific Reports. 7/26/2024, Vol. 14 Issue 1, p1-19. 19p.
Autor:
Luong Duc Long
Publikováno v:
Alexandria Engineering Journal, Vol 79, Iss , Pp 480-501 (2023)
Unlike many previous studies that often focus on optimizing energy efficiency for buildings when detailed design drawings are available, this paper introduces a newly integrated model for energy-efficient building envelope design in the early stages
Externí odkaz:
https://doaj.org/article/7a77b1b7a99c4703b75d9f3a3ffd4d62
Autor:
Luong, Duc Long
L’objectif de ces travaux est pour d’apporter des solutions innovantes à la réalisation de dispositifs passifs performants et compacts, susceptibles d’intéresser les concepteurs de circuits RF et millimétriques. Ces dispositifs sont basés
Externí odkaz:
http://www.theses.fr/2018LYSES007/document
Autor:
Truong, Ngoc-Son1,2,3 (AUTHOR), Luong, Duc Long1,2 (AUTHOR) luongduclong@hcmut.edu.vn, Nguyen, Quang Trung1,2,3 (AUTHOR)
Publikováno v:
Energies (19961073). May2023, Vol. 16 Issue 10, p3976. 24p.
Publikováno v:
In Journal of Computational Design and Engineering April 2018 5(2):160-172
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
IOP Conference Series: Materials Science & Engineering; 4/10/2023, Vol. 1289 Issue 1, p1-19, 19p
Publikováno v:
MATEC Web of Conferences, Vol 251, p 01015 (2018)
Alumina cement which was used in this investigation contains about 56% of Al2O3 in the component. Early compressive strength alumina cement at 1 and 3 days can be achieved of 85% compressive strength value at 28 days. After a long period of hydration
Externí odkaz:
https://doaj.org/article/c66d3603664b4e96bd59792bc55b54d0
Autor:
Duc-Hoc Tran, Luong Duc Long
Publikováno v:
Engineering, Construction and Architectural Management. 25:623-638
PurposeAs often in project scheduling, when the project duration is shortened to reduce total cost, the total float is lost resulting in more critical or nearly critical activities. This, in turn, results in reducing the probability of completing the
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.