Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Lu Lu Mao"'
Publikováno v:
Applied Mechanics and Materials. :1715-1719
On the basis of surrounding environment, including ground geological and hydrogeological condition of a connection line between line 1 and line 3 in Chengdu subway, open cut method is used to build the connection line. The whole line is divided into
Publikováno v:
Applied Mechanics and Materials. :1711-1714
In consideration of the geology and hydrogeology of the strata in Chengdu city, and in view of the general depth of subway station, its main structure and retaining enclosure for foundation pit constructed with open cut method is generalized in this
Autor:
Lu-Lu Mao
Publikováno v:
Applied System Innovation: Proceedings of the 2015 International Conference on Applied System Innovation (ICASI 2015), May 22-27, 2015, Osaka, Japan
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::a6e5a4a71068af4217a747a17268504d
https://doi.org/10.1201/b21811-27
https://doi.org/10.1201/b21811-27