Zobrazeno 1 - 10
of 14
pro vyhledávání: '"Louis Cheng Lu Yeng"'
Publikováno v:
Applied Mathematical Modelling. 120:595-611
Publikováno v:
Annals of Operations Research.
Publikováno v:
IEEE Transactions on Systems, Man, and Cybernetics: Systems. 50:1395-1405
A fast retransmit, which reduces the sender’s waiting time before retransmitting a lost segment, is applied to guarantee data integrity with no data loss in transmission. Based on fast retransmit, many application protocols have been enhanced and e
Publikováno v:
Annals of Operations Research. 312:369-387
Recently, taking more than one means of transportation to work or to deliver goods has become common for citizens in big cities or logistics companies. A transport system that contains various transport means is called a multimodal transport system.
Publikováno v:
Expert Systems with Applications. 189:116107
As a tour agency plans a tour schedule with rail transport, it is necessary to evaluate the capacity of the rail transport network to determine the number of passengers in the tour group that can be served. This study develops a stochastic rail trans
Publikováno v:
Annals of Operations Research. 277:63-82
In last decades, air transportation plays an important role in global economy. Several scholars have studied optimizing air transportation system or proposed reliability evaluation algorithms from airline management viewpoints. This work evaluates th
Publikováno v:
Journal of Statistical Computation and Simulation. 88:2273-2286
It is essential to reduce data latency and guarantee quality of service for modern computer networks. The emerging networking protocol, Multipath Transmission Control Protocol, can reduce d...
Publikováno v:
Reliability Engineering & System Safety. 214:107757
Travelling by railway trains is usually the preferred option of travelers. Assessing whether a railway company can provide sufficient seats or cabins is meaningful for a travel agent to evaluate how the size of a tour group they can serve. A railway
Project Reliability Interval for a Stochastic Project Network Subject to Time and Budget Constraints
Publikováno v:
IEEE Transactions on Reliability. 66:689-699
Completion time and cost in a project are affected by uncertainties, such as weather, human resources availability, equipment efficiency, etc. The activity durations of the project, thus, should be regarded as stochastic. Such a project is usually mo
Publikováno v:
IEEE Transactions on Reliability. 65:867-877
For a hybrid flow shop (HFS), due to the maintenance, partial failure, and possibility of failure, the number of machines at a workstation presents multiple levels, meaning that capacity of each workstation is stochastic. This study considers the sto