Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Link Bukasa Muamba"'
Autor:
Bruno Deko Oyema, Patrick Lokata Ediho, Link Bukasa Muamba, Dominique Wetshondo Osomba, Pierre Paty Tshibumbu Kayeya
Publikováno v:
Romanian Journal of Petroleum & Gas Technology, Vol 4, Iss 1, Pp 183-200 (2023)
The contribution of the combined interpretation of geo-petroleum data in the oil exploration program of the central Cuvette basin “case of the Lokoro sub-basin” carried out as part of our scientific research for Diplome d'Etudes Approfondies stud
Externí odkaz:
https://doaj.org/article/fc9a5c462a3e4f208f475590cda48cd6
Autor:
Bruno Deko Oyema, Dominique Wetshondo Osomba, Bavon Diemu Tshiband, Patrick Lokata Ediho, Jean-Piére Kalay Kut, Jean Ondontshia Nkoyi, Link Bukasa Muamba, Joël Kabesa Kilungu
Publikováno v:
Open Journal of Yangtze Oil and Gas. :84-100
Autor:
Dominique Wetshondo Osomba, Patrick Lokata Ediho, Shams Mbundi Diambu, Bruno Deko Oyema, Benjamin Safari Kachunga, Jean Ondontshia Nkoyi, Link Bukasa Muamba, Joël Kabesa Kilungu
Publikováno v:
Open Journal of Yangtze Oil and Gas. :149-165
Autor:
Daddy Ilunga Nyembwe, Link Bukasa Muamba, Jypsie Diantesa NTemo, Joseph Ntibahanana Munezero, El-Richard Molodi Empi, Joel Kabesa Kilungu, Dominique Wetshondo Osomba, Junior Mbambo Bokitshi
Publikováno v:
I. J. of Advances in Scientific Research and Engineering-IJASRE (ISSN: 2454-8006); Vol. 5 No. 6 (2019): Volume 5 Issue 6 June (2019); 58-69
During oil exploitation, the amount of oil originally in place decreases and the pressure of the reservoir declines. So it is imperative to do a thorough study on the future behaviour of the reservoir in the face of the pressure drop and to predict i
Autor:
Joel Kabesa Kilungu, Dominique Wetshondo Osomba, Junior Mbambo Bokitshi, Shams Diambu Mbudi, El-Richard Molodi Empi, Romulus Mawa Tuzingila, Link Bukasa Muamba
Publikováno v:
International Journal of Oil, Gas and Coal Engineering. 7:109
The quantity of hydrocarbons initially in place and the technique of exploitation employed in the reservoir determine the period of an oilfield. But the quantity of hydrocarbons in a reservoir defines as a preliminary the type of mechanism drainage w
Autor:
Joel Kabesa Kilungu, Romulus Mawa Tuzingila, El-Richard Molodi Empi, Dominique Wetshondo Osomba, Kyria Museghe Kyria, Joseph Ntibahanana Munezero, Link Bukasa Muamba, Junior Mbambo Bokitshi
Publikováno v:
Petroleum Science and Engineering. 3:74
In order to carry out hydrocarbon production in the basement, a drilling must be carried out and the latter crosses several layers or formation until reaching the desired objective. At the beginning of the production, the well will have a natural pre