Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Leida C. Monterrosa"'
Autor:
Mohamed Saher Dahroug, Ricardo Rouxinol, Norolf Henriksen, Sajjad Hussain, Daniel Ndubuisi Nketah, Frode Angell-Olsen, Leida C. Monterrosa, Karianne Holen Christensen, David Fjeldsbø, Mons Midttun, Belinda Mikalsen, Mark van Aerssen, Graham Martin Ritchie
Publikováno v:
Day 3 Wed, March 10, 2021.
Drilling a nine km (Kilometers) extreme ERD (Extended Reach Drilling) well by a rig which was initially designed for six km and on a platform that did not provide any empty well slot posed a challenge to the Brage asset team. The well (A-36 A/B) was
Autor:
Kjell Kåre Fjelde, Sigurd Haaland, Sajjad Hussain, Jason Blackburn, Leida C. Monterrosa, Johan Dahl, Gisle Otto Monsen, Hans Magnus Bjoerneli, Tom Jakobsen, Ståle Østensen, Karam Sulaiman Dhaher
Publikováno v:
Day 1 Wed, April 05, 2017.
Old platforms are not well known for extended-reach drilling (ERD) operations mainly due to rig and hydraulics limitations. ERD wells demand robust rig capabilities, good hydraulics systems, and equipment reliability. In addition, the well profile, r
Publikováno v:
Day 3 Thu, March 16, 2017.
This paper aims to provide an understanding of the various measurement-while-drilling (MWD) surveying enhancement techniques applied in drilling operations at the Goliat Field located in the Barents Sea to assure accurate wellbore positioning. In hig
Publikováno v:
Day 3 Wed, May 04, 2016.
This paper explores various case studies to evaluate how an innovative methodology for sending MWD surveys up hole, based on cessation of surface RPM rather than variations of mud flow rate, helps drilling operations become more cost effective, decre
Publikováno v:
All Days.
The main purpose of this case study is to understand and evaluate how an innovative methodology for sending MWD surveys uphole, based on cessation of surface RPM rather than fluctuation of mud flow rate, leads to more effective and higher performance
Publikováno v:
Day 3 Thu, March 03, 2016.
Industry standard practices for MWD surveying consist in taken the MWD surveys at the connection; this usually will represent 30-m to 40-m interval depending of the drill pipe range used by the operator or drilling contractor. Additionally, in some o