Zobrazeno 1 - 10
of 14
pro vyhledávání: '"Laura Florez-Perez"'
Publikováno v:
Developments in the Built Environment, Vol 18, Iss , Pp 100413- (2024)
The design principle of standardisation is widely acknowledged for its potential in reducing embodied carbon emissions (CE) in prefabrications through the facilitated reuse of prefabricated elements. Yet, its effectiveness in optimising CE in precast
Externí odkaz:
https://doaj.org/article/7737b1050ba843e39bb48b1b07472d83
Autor:
Yiming Xiang, Jiachen Bu, Ke Zhu, Kehan Ma, Alex Opoku, Laura Florez-Perez, Hong Zhang, Yanhua Wu
Publikováno v:
Xiang, Y, Bu, J, Zhu, K, Ma, K, Opoku, A, Florez-Perez, L, Zhang, H & Wu, Y 2023, ' Reconsidering adaptive industrialized construction in Chinese rural areas : responding to the challenge of COVID-19 ', Building Research and Information, vol. 51, no. 3, pp. 316-332 . https://doi.org/10.1080/09613218.2022.2081119
The spread of COVID-19 has caused an increasing demand for public medical rooms, especially in Chinese rural regions. Industrialized building techniques have been shown as capable of fulfilling this demand through the case of the Leishenshan Hospital
Publikováno v:
Computer-Aided Civil and Infrastructure Engineering. 37:1602-1616
Publikováno v:
International Journal of Project Management. 39:873-886
State-owned mega construction projects are greatly driven by the top-down authoritarian leadership that ironically restricts two-way communication and free flow of ideas. Prominent studies have highlighted various critical success factors of project
Publikováno v:
Proceedings of the International Symposium on Automation and Robotics in Construction (IAARC).
Publikováno v:
Socio-Economic Planning Sciences. 86:101501
Publikováno v:
Engineering, Construction and Architectural Management.
PurposeFailures in both followership and leadership become inevitable as mega construction projects are directed and controlled by toxic leaders. Consequently, team member's desire for knowledge hoarding silence is triggered and goal alignment betwee
Publikováno v:
Sustainability; Volume 14; Issue 4; Pages: 2091
Delay factors are frequent in the construction industry globally, resulting in significant overruns in project cost and time. In context, megaprojects can be more prone to critical delays, hence, demanding a high degree of self-confident leadership.
Publikováno v:
Energy and Buildings. 279:112640
The pre-planning phase prior to construction is crucial for ensuring an effective and efficient project delivery. Realistic productivity rates forecasted during pre-planning are essential for accurate schedules, cost calculation, and resource allocat
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::abb9a940ae302159bac4280132f04dc4
https://nrl.northumbria.ac.uk/id/eprint/46528/1/2021_EC3_Word_Windows_FullPaper_Template_Final_revised.pdf
https://nrl.northumbria.ac.uk/id/eprint/46528/1/2021_EC3_Word_Windows_FullPaper_Template_Final_revised.pdf