Zobrazeno 1 - 10
of 14
pro vyhledávání: '"L Herblin"'
Publikováno v:
IOP Conference Series: Materials Science and Engineering. 278:012098
After the successful Run 1 (2010-2012), the LHC entered its first Long Shutdown period (LS1, 2013-2014). During LS1 the LHC cryogenic system went under a complete maintenance and consolidation program. The LHC resumed operation in 2015 with an increa
Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting magnets of the LHC machine shall be entirely tested at reception on modular test facilities. The operation 24 hours per day of the cryogenic test fac
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::272b65f2798c0d16fa579951d8ea4e20
http://cds.cern.ch/record/928904
http://cds.cern.ch/record/928904
Control System and Operation of the Cryogenic Test Facilities for LHC Series Superconducting Magnets
Publisher Summary Prior to their final preparation before installation in the tunnel, the ∼1800 series superconducting magnets of the Large Hadron Collider (LHC) machine will be entirely tested at reception on modular test facilities using dedicate
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::719496e11fb52871f3ea105cc6dd4e8b
https://doi.org/10.1016/b978-008044559-5/50245-3
https://doi.org/10.1016/b978-008044559-5/50245-3
Publisher Summary This chapter presents the general layout and describes the overall performance of superconducting magnets for the Large Hadron Collider (LHC) machine. For this purpose and to reach the reliability and efficiency at the nominal load
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::0aa5a607e811f785a07f3e3c538bbd48
http://cds.cern.ch/record/795002
http://cds.cern.ch/record/795002
Publikováno v:
Proceedings of 16th International Symposium on Fusion Engineering.
An integrated chevron type cryopump system for the JET pumped divertor program consisting of two independent 180/spl deg/ elements has been operational at JET since mid 1994. The pumping speed of the pump in situ in the torus is /spl sim/200000 l/s b
Publikováno v:
A Cryogenic Engineering Conference Publication ISBN: 9781461380221
A supercritical helium cooling loop for the two JET divertor cryopumps has been tested, commissioned and is operational practically uninterrupted for over one year. Operation experience under a number of different boundary and transient conditions ha
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::533618b862fdd1cb4a979034a0db792e
https://doi.org/10.1007/978-1-4613-0373-2_97
https://doi.org/10.1007/978-1-4613-0373-2_97
Kniha
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.