Zobrazeno 1 - 10
of 67
pro vyhledávání: '"Kruk, G"'
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Jacquet, D, Baggiolini, V, Bau, J C, Buttner, M, Deghaye, S, Kruk, G, Roderick, C, Sigerud, K, Sliwinski, W, Wenninger, J, Wozniak, J, Zerlauth, M
The many modifications of the software packages that have been done during LS1 will be reported. Based on the issues and requirements that have been presented in the 2012 Evian workshop [1], the solutions implemented and their impact on operation wil
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::870d0172a3d35ac8496a727e80fe6f98
http://cds.cern.ch/record/2295100
http://cds.cern.ch/record/2295100
This note describes how optics definitions are handled by the Proton Synchrotron Complex control system. It presents the functionality of the software developed to support optics management. The optics are stored in LSA database and the associated ta
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::aa34876e43e7e628bffef272354603ec
http://cds.cern.ch/record/1621889
http://cds.cern.ch/record/1621889
Plug-in based software architectures [1] are extensible, enforce modularity and allow several teams to work in parallel. But they have certain technical and organizational challenges, which we discuss in this paper. We gained our experience when deve
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::9c14f636a1ce20e7333818c5e5fbea92
http://cds.cern.ch/record/1611117
http://cds.cern.ch/record/1611117
After over 7 years in operation the Software Interlock System (SIS) has become an indispensable and mission critical controls tool covering many operational areas from general machine protection to diagnostics. The growing number of running instances
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::02b9160323b58aeb06b6a7c042aba8d3
http://cds.cern.ch/record/1611077
http://cds.cern.ch/record/1611077
Autor:
Kruk, G, Deghaye, S, Kulikova, O, Lezhebokov, V, Pace, M, Pera Mira, P, Roux, E, Wozniak, J Pawel
Renovation of the control system of the CERN LHC injectors was initiated in 2007 in the scope of the Injector Controls Architecture (InCA) project. One of its main objectives was to homogenize the controls software across CERN accelerators and reuse
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::c8cbfa6c844b032d81dca01f31e7a556
http://cds.cern.ch/record/1612166
http://cds.cern.ch/record/1612166
During the 10 years since it's first operational use, the scope and scale of the CERN Accelerator Logging Service (LS) has evolved significantly: from an LHC specific service expected to store 1TB / year; to a CERN-wide service spanning the complete
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::338136f595de07e18417364ca7dd5e16
http://cds.cern.ch/record/1611082
http://cds.cern.ch/record/1611082
Autor:
Fartoukh, S, Tomas, R, Goddard, B, Hofle, W, Jacquet, D, Kruk, G, Lamont, M, de Maria, R, Miyamoto, R, Mueller, G, Pojer, M, Ponce, L, Redaelli, S, Ryckx, N, Steinhagen, R, Strzelczyk, M, Vanbavinckhove, G, Wenninger, J
This note highlights the results obtained during the third so-called ATS MD which took place in 2011. The goal of this MD was extremely challenging, targeting a pre-squeezed beta* of 40 cm in ATLAS and CMS, followed by a telescopic squeeze of these t
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::8c48ba46356b5a9b96248ab8c02f40fc
http://cds.cern.ch/record/1407532
http://cds.cern.ch/record/1407532
Autor:
Eduardo nebot, Dehning, B., Holzer, E. B., Jackson, S., Kruk, G., Nemcic, M., Nordt, A., Orecka, A., Roderick, C., Sapinski, M., Skaugen, A., Zamantzas, C.
Publikováno v:
Scopus-Elsevier
The Beam Loss Monitoring system (BLM) for the LHC consists of about 3600 Ionization Chambers (IC) located around the ring. Its main purpose is to request a beam abort when the measured losses exceed a certain threshold. The BLM detectors integrate th
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=dedup_wf_001::c79057f84d8ebe060b46f038415226ad
http://cds.cern.ch/record/1379461
http://cds.cern.ch/record/1379461
Autor:
Boccardi, A, Butterworth, A, Calvo Giraldo, E, Denz, R, Gasior, M, Gonzalez, JL, Jackson, S, Jensen, LK, Jones, OR, King, Q, Kruk, G, Lamont, M, Page, S, Steinhagen, RJ, Wenninger, J
The LHC deploys a comprehensive suite of beam-based feedbacks for safe and reliable machine operation. This contribution summarises the commissioning and early results of the LHC feedback control systems on orbit, tune, chromaticity, and energy. Thei
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::8c88172a412144e935ffef927d826611
http://cds.cern.ch/record/1272167
http://cds.cern.ch/record/1272167