Autor:
Eleanor Bell, Johnny Bårdsen, Terje Sporstøl, Kjell Tore Nesvik, Stefan Dinger, Azwan Hadi Keong, Andrei Casali, Frank Lind, Bjørn Engvald Staveland Nilsen
Publikováno v:
Day 4 Thu, October 21, 2021.
Coiled tubing (CT) operations in the Norwegian continental shelf (NCS) often require a long and large-outside-diameter pipe due to big diameter completions, deep wells, and the need for high annular velocity during fluid circulation. However, getting
Publikováno v:
All Days.
Well Heidrun A-45, located in the Norwegian Sea, was completed in an unconsolidated sandstone reservoir that required sand control. The lower zone was completed with a gravel pack completion and the upper zone was left unperforated. To enable product
Publikováno v:
All Days.
Coiled Tubing (CT) equipment in the Norwegian sector of the North Sea has traditionally been heavy, due to CT reels using larger sizes of CT – a trend also observed in other areas. Due to the requirement of performing well interventions in longer w
Publikováno v:
All Days.
This paper is a case history of what is believed to be the first ever utilisation of Coiled Tubing on a FPSO (Floating Production Storage Offloading) vessel to dissolve hydrate(s) in the riser. The main focus of this paper is to: 1) Publish actual jo
Publikováno v:
All Days.
Coiled Tubing operations in the North Sea are regularly challenged by crane lift capacity limitations when attempting to bring coiled tubing reels onboard. Very often the crane capacity or weather conditions determine the CT size to be used for the a
Publikováno v:
All Days.
This case study provides an overview of the Coiled Tubing (CT) operation performed for Statoil on the Heidrun field in 2002. The operation covered cleaning of a downhole sand control screen utilizing the Roto-Jet Technology, followed by installation