Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Kittithuch Hnuruang"'
Autor:
Thinh Vo, Reawat Wattanasuwankorn, Wiwat Pattarachupong, Thum Sirirattanachatchawan, Kittithuch Hnuruang, Kitti Kanpiromkul, Apiwat Nadoon, Kanwisa Siriphruek, Pavin Pirom, Anan Thipprasert, Chatchai Paramart, Charin Chaisri, Panya Buatong
Publikováno v:
Day 1 Tue, August 09, 2022.
During most hydraulic fracturing operations, coiled tubing (CT) is used as a contingency option for well cleanup in the case of sand screenout. An alternative improvised solution is presented introducing a single-shot circulating valve into the frac
Autor:
Kittipat Wejwittayaklung, Apiwat Nadoon, Kittithuch Hnuruang, Pavin Piron, Potchara Promwikorn, Prasert Jirajindakul, Rossawan Chandakaew, Supoth Singsa-Nga, Takonpran Kunpitaktakun, Wararit Toempromraj, Yaovanart Yokrat, Pornchuda Konganuntragul
Publikováno v:
Day 1 Tue, August 09, 2022.
To ensure all wells are in good and safe condition and can be operated as designed, the well integrity of individual wells must be maintained. However, lack of utilization and analysis of the well integrity status in brownfields with lots of qualitat
Autor:
Thum Sirirattanachatchawan, Sorawee Rongdechprateep, Kritsada Charoenniwesnukul, Marut Wantawin, Theerapat Suppachokinirun, Kittithuch Hnuruang
Publikováno v:
Day 1 Tue, June 08, 2021.
Hydraulic fracturing activities implemented in Sirikit onshore oilfield of Thailand over a decade. Before 2018, the variation in post-fracturing production performance resulted in about 50% stimulation success rate. This outcome posted a big challeng
Autor:
Apiwat Nadoon, Suwin Sompopsart, Wararit Toempromraj, Kittithuch Hnuruang, Chayapod Beokhaimook
Publikováno v:
Day 1 Mon, September 30, 2019.
In the onshore field in the Northern part of Thailand, the wells are typically produced with gas lift and converted to beam pump later, using the annulus space for gas separation. In the past, the completion string must be replaced to switch to beam