Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Kingsley Okenyi"'
Publikováno v:
Day 1 Tue, March 03, 2020.
In 2017, the business plan set out was to deliver best-in-class wells in an upcoming deepwater drilling campaign offshore West Africa in 28 days (ca. 25 days/10000 ft) which is 10 days shorter than the average performance on the previous campaign, sa
Autor:
Kingsley Okenyi, Edgar Mba Ognane, Aihanuwa Ukponmwan, Ejiro Ogbodu, Abayomi Apena, Ejiro Emifoniye
Publikováno v:
Day 3 Thu, September 07, 2017.
In 2012, a benchmarking exercise was conducted to assess the performance of Bonga wells, a Deepwater (DW) project in Nigeria. The review revealed that the average Bonga well ranked fourth Quartile when compared with similar DW wells globally. After r
Publikováno v:
Day 2 Tue, August 01, 2017.
To achieve superb performance in drilling, one should look at the major causes of failure and tackle them head on. That was exactly what was done in Nigeria. In collaboration with directional drilling contractor, the Shell Nigeria Exploration and Pro