Zobrazeno 1 - 10
of 24
pro vyhledávání: '"Kimmo Nurmi"'
Autor:
Kimmo Nurmi, Nico Kyngäs
Publikováno v:
Advances in Operations Research, Vol 2021 (2021)
Workforce scheduling process consists of three major phases: workload prediction, shift generation, and staff rostering. Shift generation is the process of transforming the determined workload into shifts as accurately as possible. The Shift Minimiza
Externí odkaz:
https://doaj.org/article/76938e1efd9746ae8a41c12cf2872c86
Publikováno v:
Procedia Computer Science. 219:1518-1526
Autor:
Kimmo Nurmi, Nico Kyngäs
Publikováno v:
FedCSIS (Position Papers)
Publikováno v:
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
Generating a schedule for a professional sports league is an extremely demanding task. Good schedules have many benefits for the league, such as higher attendance and TV viewership, lower costs, and increased fairness. The Australian Football League
Publikováno v:
Microsystem Technologies. 24:273-283
Session key exchange has become an addressed topic in the field of communications security, particularly for the IP-based call session that travels through the public network. This paper proposes a hybrid algorithm for session key exchange. The algor
Publikováno v:
Journal of Advances in Information Technology. 7:97-104
Publikováno v:
Journal of the Operational Research Society. 65:1770-1779
This paper presents a method to schedule a triple round robin tournament, which involves minitournaments, each hosted by one team. A key issue is that at the end of the season the number of home games should be balanced over the teams, despite the fa
Publikováno v:
Lecture Notes on Software Engineering. :230-236
Abstract—A large number of metaheuristics and local search methods have been developed for combinatorial and global optimization. We present our PEAST algorithm which is capable of solving very difficult real-world scheduling problems, such as w
Publikováno v:
Transactions on Engineering Technologies ISBN: 9789401795876
Good schedules have many benefits for the league, such as higher incomes, lower costs and more interesting and fairer seasons. Generating a schedule for a professional sports league is an extremely demanding task and requires computational intelligen
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::5e1a298aa1013fc5caf8cc11a0737182
https://doi.org/10.1007/978-94-017-9588-3_12
https://doi.org/10.1007/978-94-017-9588-3_12