Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Khenzig Biche-ool"'
Publikováno v:
Architecture and Engineering, Vol 6, Iss 4, Pp 34-41 (2021)
Introduction: Planning integrated development of a residential area involves determining the composition of the objects to be built and creating an appropriate integration mechanism, backed up by a generalized work schedule. The existing methods of f
Externí odkaz:
https://doaj.org/article/ea3acd8ff6a84f28a8a22e755e3d4f2c
Publikováno v:
Architecture and Engineering, Vol 5, Iss 4, Pp 44-50 (2020)
Introduction: The design stage and preparations for construction include the development of construction schedules needed to justify the duration of construction works. Methods: Based on probabilistic scheduling, a multitude of solutions can be gener
Externí odkaz:
https://doaj.org/article/18d024ccc48c4f06ae3ef1aa18cdbbb8
Publikováno v:
Architecture and Engineering, Vol 5, Iss 4, Pp 44-50 (2020)
Introduction: The design stage and preparations for construction include the development of construction schedules needed to justify the duration of construction works. Methods: Based on probabilistic scheduling, a multitude of solutions can be gener