Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Khalid Akyabi"'
Autor:
Khalid Akyabi, Gilbert Rahhal, Bhushan Popatrao Salve, Azza El Hassan, Romulo Bermudez Alvarado, Abdelkerim Doutoum Mahamat Habib, Badr Musabbeh Al Azizi, Saurabh Kapoor, Bipin Jain, Sigit Kustanto, Luis Navas
Publikováno v:
Day 3 Wed, November 14, 2018.
Lost circulation is a widespread problem in many formations in the United Arab Emirates, including Shallow Unconsolidated, Shallow Vuguler and Limestone. To minimize losses during drilling and cementing, several types of lost circulation solutions su
Autor:
Sigit Kustanto, Christoper Steele, Laurie Hayden, James Thomas Ryan, Khalid Akyabi, Sheldon Seales, Catalin D. Ivan, Melanie Reichle, Yousif Al Katheeri
Publikováno v:
Day 3 Wed, November 14, 2018.
This paper covers the seven year history of the reservoir drilling campaign offshore Abu Dhabi, from the early use of a solids free, brine/water-based mud to the recent application of non-damaging, non-aqueous fluids with micronized acid-soluble ilme
Autor:
Daniel Beaman, Jon Molster, Clews Matthew Shane, Michael Niznik, Osama Al Khatib, Daniel Newton, Khalid Akyabi, Juan Alvarez, Shardul Parihar, Rashad Allahyarov, James Thomas Ryan
Publikováno v:
Day 3 Wed, November 09, 2016.
The long term development from four artificial islands of this giant offshore field in the United Arab Emirates (UAE) is requiring longer and longer ERD wells. This can only be achieved by drilling higher angle, higher departure and increasing latera
Autor:
Y. Al Katheeri, Khalid Akyabi, C. G. Page, M. Al Awadhi, Paul E. Pastusek, H. Al Junaibi, M. R. Niznik, Jeffrey R. Bailey
Publikováno v:
Day 2 Tue, November 08, 2016.
A workflow that combines optimization of the drill string and bottomhole assembly (BHA) design during well planning and then applies advanced surveillance tools to a well-trained drilling crew yields reduced vibrations, higher drilling rates, and les
Autor:
Khalid Akyabi, Darren Pais, Victoria R. Wilkins, Paul E. Pastusek, Alex Bolzan, Melanie Reichle, Michael Owens, James Thomas Ryan, Dave Barrette
Publikováno v:
Day 3 Wed, September 28, 2016.
This paper documents some of the key findings on the data required and methods used to detect and correct issues with drilling control systems such as auto drillers, top drive active torsional damping systems, and heave compensation systems.It has be
Publikováno v:
All Days.
Abstract RasGas Company Limited has been utilising the ExxonMobil Fast Drill Process to drive continuous improvement in drilling operations in Qatar's North Field since its roll-out in 2005. Implementation of the process has resulted in significant i