Zobrazeno 1 - 5
of 5
pro vyhledávání: '"Khairul Azmi Mahadi"'
Autor:
Sirag Al Zayani, Saim Rahman, Bukhari Samsudin, Muhammad Ruzwin Rusli, Khairul Azmi Mahadi, M. Alham M. Johan, Mohd Razeif Roslan, Muhammad Zulkhairi Salleh, Thierry Wee, Masran Kadir, Sheereen Norizan
Publikováno v:
Day 1 Tue, March 23, 2021.
The Seligi field, located 240 kilometers offshore peninsular Malaysia in the Malay basin was discovered in May 1971 and is one of the largest oil fields in Malaysia. Sand production in the Seligi field has been observed, especially from the J reservo
Autor:
Yee Choy Chen, Mohd Izzat Bin Mohd Nizam, Saharul Hashim, Maharon Bin Jadid, Khairul Azmi Mahadi, Christopher Ogbonna
Publikováno v:
All Days.
Abstract The FN field is a carbonate reservoir contracted to deliver 250 MMscf/D gas for liquefied natural gas (LNG). Three horizontal wells were drilled and completed to meet the gas demand. The reservoir thickness ranges from 45 to 75 m, and the av
Publikováno v:
All Days.
Abstract The KN field in KM cluster is located approximately 200km offshore, at water depths ranging from 59–102m. The field is part of the KM Cluster Integrated Development Plan, where the primary objective for KN field development is to recover t
Autor:
Mohd Imran Feroze, Khairil Faiz Abdul Aziz, Murray David Forbes, Abdil Adzeem B Ahmad Mahdzan, Muhamad Nasri Dzul-Fikar, Christopher Elliott, Khairul Azmi Mahadi, Mahzan B. Mohammad
Publikováno v:
All Days.
An offshore operator in Malaysia had run a completion string in a highly deviated 7-in. gas well. When continuous pressure build-up in the production casing annulus was observed during well clean-up, leakage in the completion system was suspected. Af
Publikováno v:
All Days.
Cleanup operations of gas wells are conducted when the well is kicked off and tested the first time. During cleanup, the drilling and completion fluids come out of the well along with the produced gas and associated liquids. The phenomena is transien