Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Keith Silverman"'
Publikováno v:
Day 3 Wed, May 04, 2022.
Due to rig availability and costs, operators can face significant delays in well decommissioning before plug and abandonment (P&A), during which temperature and pressure monitoring is required. If an umbilical connected to these wells fails, then it
Autor:
Keith Silverman
Publikováno v:
Proceedings of the Water Environment Federation. 2008:6410-6410