Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Katsumi Fushiki"'
Publikováno v:
18th International Conference on Nuclear Engineering: Volume 6.
Shimane Nuclear Power Station Unit No.3 (hereinafter NS-3) with 1,373 MW of maximum electric power being supplied to The Chugoku Electric Power Co., Inc. (Hereafter The Chugoku EPCO) is now under construction together with Hitachi-GE Nuclear Energy (
Publikováno v:
Volume 3: Thermal Hydraulics; Current Advanced Reactors: Plant Design, Construction, Workforce and Public Acceptance.
The Chugoku Electric Power Co., Inc has been constructing Shimane nuclear power station unit No.3 as our top priority, which is the fifth ABWR (Advanced Boiling Water Reactor) and one of the largest nuclear power plants (Electrical output: 1,373 MWe)
Publikováno v:
The Proceedings of the International Conference on Nuclear Engineering (ICONE). 2003:201