Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Karim Amrouche"'
Publikováno v:
Revue des Énergies Renouvelables, Pp 131 – 141-131 – 141 (2024)
The growth of renewable energy development and exploitation has been strong in recent years. The multisource pumping is considered as one of the most widely adopted solutions in rural (agricultural) areas. This paper presents a study of different com
Externí odkaz:
https://doaj.org/article/080e58c4f1814bb99f51dca9b1cbbc6f
Autor:
Mourad Boudhar, Karim Amrouche
Publikováno v:
RAIRO - Operations Research. 50:223-232
This paper considers a reentrant flow shop with two machines and exact time lag L , in which each task may be processed in this order M 1 , M 2 , M 1 and there is an identical time lag between the completion time of the first operation and the start
Publikováno v:
European J. of Industrial Engineering. 14:1
This paper addresses the chain-reentrant flow shop scheduling problem with two machines and n non-preemptive jobs in the presence of the no-wait constraint; we assume that each job passes from the first machine to the second and returns back to the f
Publikováno v:
European J. of Industrial Engineering. 14:573
Publikováno v:
MIM 2016, 8th IFAC Conference on Manufacturing Modelling, Management and Control, 28-30 June, Troyes, France
MIM 2016, 8th IFAC Conference on Manufacturing Modelling, Management and Control
MIM 2016, 8th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2016, Troyes, France
MIM 2016, 8th IFAC Conference on Manufacturing Modelling, Management and Control
MIM 2016, 8th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2016, Troyes, France
We consider a chain reentrant shop problem with m machines, in which a no-wait constraint is imposed. Each job goes through m machines in a fixed order and return back to the first machine for its last operation. We seek to minimize the overall finis
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::db45aaccb832c18c2cdb264ad1dcbeda
https://hal-utt.archives-ouvertes.fr/hal-02796623
https://hal-utt.archives-ouvertes.fr/hal-02796623
Publikováno v:
International Journal of Production Research
International Journal of Production Research, Taylor & Francis, 2016, 55 (1), pp.285-295. ⟨10.1080/00207543.2016.1205235⟩
International Journal of Production Research, 2016, 55 (1), pp.285-295. ⟨10.1080/00207543.2016.1205235⟩
International Journal of Production Research, Taylor & Francis, 2016, 55 (1), pp.285-295. ⟨10.1080/00207543.2016.1205235⟩
International Journal of Production Research, 2016, 55 (1), pp.285-295. ⟨10.1080/00207543.2016.1205235⟩
International audience; The two-machine chain-reentrant shop scheduling with the objective of minimizing the makespan, assumes that the taskspass from the first machine to the second and return back to the first machine. In this paper, we consider th
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::b4d3efce6ec2b97a1d3a1d872d7a17b8
https://hal-utt.archives-ouvertes.fr/hal-02491672
https://hal-utt.archives-ouvertes.fr/hal-02491672