Zobrazeno 1 - 10
of 14
pro vyhledávání: '"K. A. Shutov"'
Autor:
Liudmila V. Potanina, I. F. Chensky, S. A. Lelekhov, V. Tronza, K. A. Shutov, D. S. Kaverin, V.S. Vysotsky, V. M. Patrikeev, A. Taran, Sergey S. Fetisov, M. V. Kochetov
Publikováno v:
IEEE Transactions on Applied Superconductivity. 26:1-7
The Russian Scientific R&D Cable Institute was obliged to produce and to deliver 20% toroidal field (TF) conductors and 20% poloidal field (PF) cables for the ITER magnet system. The task has been completed in October 2015. This work was a great tech
Autor:
A. V. Naumov, S. A. Lelekhov, K. A. Shutov, I.A. Kovalev, V.I. Shcherbakov, V.E. Keilin, S.L. Kruglov, A.A. Ilin
Publikováno v:
Technical Physics. 60:1697-1704
In the case of plasma current interruption in tokamaks, the conductor of toroidial field (TF) coils experiences the action of a pulsed decreasing magnetic field (PDMF) parallel to the conductor’s axis. To estimate the stability of a cable-in-condui
Autor:
Y. Takahashi, Vitaly S. Vysotsky, V. Tronza, D. S. Kaverin, K. A. Shutov, Maxim V. Kochetov, Konstantin S. Marinin, Alexander V. Paramonov, V V Zubko
Publikováno v:
IEEE Transactions on Applied Superconductivity. 24:1-4
To form a cable-in-conduit conductor (CICC) a cable should be inserted into a jacket under tensile force that is increasing with length of insertion. This tensile force can lead to both elongation and untwisting of a cable with increase of a twist pi
Autor:
Vitaly S. Vysotsky, K. A. Shutov, G. G. Svalov, N.V. Polyakova, Liudmila V. Potanina, V. Tronza, D. S. Kaverin, Sergey S. Fetisov
Publikováno v:
IEEE Transactions on Applied Superconductivity. 24:1-5
The residual resistance ratio (RRR) is an important parameter affecting the stability of superconductors and the quench protection properties of magnets. During the manufacture of cable-in-conduit-conductors based on Nb3Sn strands, RRR may change not
Publikováno v:
IEEE Transactions on Applied Superconductivity. 21:1001-1004
The test facility developed in Russian Scientific R&D Cable Institute permits to perform extensive tests of heavily instrumented HTS cable models with length up to 5 m. Several HTS cables with different design have been developed and tested at this f
Publikováno v:
IEEE Transactions on Applied Superconductivity. 20:394-397
Complex through technology, developed in JSC VNIIKP for serial production of ITER PF and TF cables and TF conductors, is described. This technology was developed as a result of performing some RD (2) Cabling workshop; (3) Jacketing line equipped with
Autor:
K. A. Shutov, I.P. Radchenko, V.E. Sytnikov, A.V. Rychagov, Vitaly S. Vysotsky, N.V. Polyakova, V V Zubko, Sergey S. Fetisov, A.A. Nosov
Publikováno v:
IEEE Transactions on Applied Superconductivity. 19:1702-1705
In the framework of the Russian R&D Program for superconducting power devices, an experimental 30 m HTS power cable has been developed. Three 30 m phases with nominal current of ~2 kA and 20 kV operating voltage were delivered as the result of the pr
Autor:
V.E. Sytnikov, N.V. Polyakova, Vitaly S. Vysotsky, A.A. Nosov, K. A. Shutov, Sergey S. Fetisov
Publikováno v:
IEEE Transactions on Applied Superconductivity. 19:1706-1709
In the framework of the Russian R&D Program for superconducting power devices, the 30 m HTS power cable has been developed made of 1 G Bi-2223 tapes. Before the full length cable production, as the first prototype the short 5 m cable model was produc
Publikováno v:
IEEE Transactions on Applied Superconductivity. 19:1770-1773
Power cables are considered as the most advanced HTS applications. During cables' production numbers of HTS tapes are twisted around a circular former in several layers. The twisting leads to mechanical stresses for the tapes that may affect their su
Autor:
N.V. Polyakova, E.A. Lobanov, V.E. Sytnikov, A. Rychagov, I.P. Radchenko, V.S. Vysotsky, K. A. Shutov, Sergey S. Fetisov
Publikováno v:
IEEE Transactions on Applied Superconductivity. 17:1684-1687
In the Russia's Scientific R&D Cable Institute (VNIIKP) the 5 m cable core sample was produced and tested as a first prototype in preparation for the production of a proposed 30 m 3-phase cable with a design rating of 2 kArms and planned operating vo