Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Jyoti Prakash Nayak"'
Publikováno v:
Day 4 Thu, May 03, 2018.
A well in the Panna-Mukta-Tapti Joint Venture (PMT JV) was completed using an isolation valve as the method of isolating the reservoir whilst running the completion into the well. Mechanical failure to open the valve was not anticipated as the isolat
Autor:
Abhay Mudgal, Jyoti Prakash Nayak, Maniram Sankar, Dickson Omonze, Ashootosh Garg, Thomas Pinto, Vivek Agrawal, Abdo Ahmad, Markandeya Patowary
Publikováno v:
Day 2 Wed, April 05, 2017.
This paper will describea tubing cut operation carried out on a deepwater rig without having to first perform the usual, time consuming rig operations to work tension down to the target cut depth. Avoiding this standard procedure was achieved through
Publikováno v:
Day 2 Wed, March 22, 2017.
This paper presents the significant benefits accomplished from the utilization of robotic, electric-line (e-line) intervention to mill out a malfunctioning flapper valve versus the use of coiled tubing (CT). In addition, it will discuss the flexibili
Autor:
A. Shah, Jyoti Prakash Nayak, S. Vermani, Arunabh Parasher, Manish Dutt Kothiyal, I. Goyal, Thomas Pinto, N. Pandey, Sharad Kumar Goenka
Publikováno v:
Day 1 Mon, November 14, 2016.
Well X is a horizontal oil producer in AB-3 formation of the B field situated in the RJ-ON-90/1 block of Western India. Intervention in a horizontal well is inherently challenging, but the complex completion equipment of this well imposed additional
Autor:
Japes Bera, Jyoti Prakash Nayak
Publikováno v:
Advanced Materials Research. 548:12-16
Silica-based porous bioactive ceramics was prepared by gel-casting method using silica xerogel powder. Xerogel was derived from rice husk ash. 42 vol.% solid containing slurry was prepared in 1:30 (MBAM:AM) monomer cross-linker solution. The srurry w
Publikováno v:
All Days.
Crane, space and height restrictions often pose problems when it comes to traditional intervention methods; adding daylight requirements, which are often a result of such platform restrictions, makes interventions even more challenging. When slicklin
Publikováno v:
All Days.
Using coiled tubing (CT) to clean sand from wellbores to improve production is a field proven, practical, and effective method. However, large CT units are often unavailable and unsupported by the wellhead platform (WHP), or may require a workover ri