Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Juan Ernesto Wyss Porras"'
Publikováno v:
Labor & Engenho, Vol 10, Iss 1 (2016)
The impact of the installation of a large-scale photovoltaic (PV) system to the electric power grid management is analyzed in a series of two works: Part 1 and Part 2. The PV generation is estimated in Part 1. By applying the results of Part 1, the G
Externí odkaz:
https://doaj.org/article/c110796cb5af4131b8c15af458b6d3fc
Publikováno v:
Labor & Engenho, Vol 9, Iss 4 (2015)
The impact of the installation of a large-scale photovoltaic (PV) system to the electric power grid management is analyzed numerically in this series of works. In this part 1, the solar irradiance at the target country, Guatemala, is evaluated with a
Externí odkaz:
https://doaj.org/article/15204ec353ec486aabdaa917ec033523
Publikováno v:
Labor e Engenho; v. 9 n. 4 (2015): out./dez.; 90-102
Labor e Engenho; Vol. 9 No. 4 (2015): out./dez.; 90-102
Labor e Engenho; Vol. 9 Núm. 4 (2015): out./dez.; 90-102
Labor & Engenho
Universidade Estadual de Campinas (UNICAMP)
instacron:UNICAMP
Labor & Engenho, Vol 9, Iss 4 (2015)
Labor e Engenho; Vol. 9 No. 4 (2015): out./dez.; 90-102
Labor e Engenho; Vol. 9 Núm. 4 (2015): out./dez.; 90-102
Labor & Engenho
Universidade Estadual de Campinas (UNICAMP)
instacron:UNICAMP
Labor & Engenho, Vol 9, Iss 4 (2015)
The impact of the installation of a large-scale photovoltaic (PV) system to the electric power grid management is analyzed numerically in this series of works. In this part 1, the solar irradiance at the target country, Guatemala, is evaluated with a