Zobrazeno 1 - 10
of 57
pro vyhledávání: '"Jovanović, Milenko"'
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2023, Iss 1, Pp 1-6 (2023)
Today, there is a large number of software in which various mathematical algorithms for optimization the open pits are implemented. However, the importance of experience of the mining engineers in planning is still crucial for the quality of mining p
Externí odkaz:
https://doaj.org/article/185b93e1247a404b9458a00cb8cb47bf
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2023, Iss 2, Pp 9-16 (2023)
The lead and zinc ore are expected to be mined at the open pits Žuta Prla and Brskovo near Mojkovac, Montenegro. During ore mining and flotation processing, the waste from the open pits and tailings from pre-concentration (DMS) and flotation tailing
Externí odkaz:
https://doaj.org/article/563369e834384f48958e06d39e60285d
Autor:
Požega Emina, Vuković Nikola, Gomidželović Lidija, Janošević Miloš, Jovanović Milenko, Marjanović Saša, Mitrović Milijana
Publikováno v:
Science of Sintering, Vol 55, Iss 1, Pp 57-70 (2023)
In order to study the effect of Zr doping on the thermoelectric properties of p-type Bi10.17Sb30.72 Zr0.35Te58.28Se0.48 single crystal, аn ingot was prepared by Bridgman method. Cut and cleaved samples from different regions of ingot were charact
Externí odkaz:
https://doaj.org/article/d8fc80a5ab1e4068b93d0afd7b71ccd7
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2021, Iss 1-2, Pp 35-42 (2021)
Mining processes are complex and complicated, with many different economic, technical, environmental and other parameters that must be planned before the project gets its practical value. Many of these parameters are evaluated independently of others
Externí odkaz:
https://doaj.org/article/ffa305e87bb148cc8303b7445cb931b9
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2019, Iss 3-4, Pp 21-28 (2019)
The development of mining operations at the South Mining District Open Pit of the Copper Mine Majdanpek is conditioned in the following short term by removal the accumulated water, sludge and sediment from the inactive water collector from the level
Externí odkaz:
https://doaj.org/article/8ce3ffbd602c4973a25df759bef1c439
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2018, Iss 1-2, Pp 61-68 (2018)
The existing landfill at the site 'Maljevac' is still active and it should provide the additional space for ash and slag disposal and continue the exploitation period as long as possible. For these purposes, in the licensed GEMS and Minex software, t
Externí odkaz:
https://doaj.org/article/b149fbdfb16d448688e59ba2d689ff9d
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2018, Iss 1-2, Pp 17-26 (2018)
The existing landfill at the site 'Maljevac' is still active and should provide the additional space for ash and slag disposal in the following period. For these purposes, the stability analysis of the existing landfill condition, as well as the stab
Externí odkaz:
https://doaj.org/article/6626053671ec4075a9063cc01417865a
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2017, Iss 1-2, Pp 35-40 (2017)
In order to provide better and easier loading of useful component and overburden, the drilling and blasting belong to the important work operations at the open pits. Borehole drilling represents a source of harmful respirable mineral dust beside the
Externí odkaz:
https://doaj.org/article/498fa4e835d24eaca62d30662fe45d14
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2017, Iss 3-4, Pp 165-170 (2017)
In the open pit mining of mineral raw materials, blasting, whose role is to break the undisturbed mass for easier loading, is the necessary technological phase. In the mass blasting at the open pits of metal ore, there is a rise of cloud composed of
Externí odkaz:
https://doaj.org/article/aaccee27e5c24352bb6177c3aba482cd
Publikováno v:
Mining and Metallurgy Engineering Bor, Vol 2016, Iss 3, Pp 47-52 (2016)
This work gives the calculation methodology of air pipeline for dusty air removal on the example of air pipeline for the HP 200 secondary crusher dedusting, designed for the needs of reconstruction the Flotation Plant Bor. The analysis was done by ca
Externí odkaz:
https://doaj.org/article/2640d04ef90f4312a4353d3f09140ddf