Zobrazeno 1 - 10
of 21
pro vyhledávání: '"José R. Wilhelmi"'
Publikováno v:
Energies, Vol 9, Iss 6, p 446 (2016)
The establishment of more severe hydrological environmental constraints, usually as seasonal minimum flows (ϕ) and maximum ramping rates (ρ), on hydropower operation is a growing trend. This paper presents a study on the influence of ϕ and ρ on t
Externí odkaz:
https://doaj.org/article/924abbae87de4f44868f20ccf4704131
Publikováno v:
Energy. 112:629-641
The establishment of more severe hydrological environmental constraints, usually minimum flows and maximum ramping rates, on hydropower operation is a growing trend in the world. This paper presents the results of an attempt to assess the long-term e
Publikováno v:
Energy Procedia, ISSN 1876-6102, 2016-01, Vol. 87
Archivo Digital UPM
instname
Archivo Digital UPM
instname
This paper presents a study on the influence of maximum ramping rates (ρ) on the water values of a real hydropower plant. For this purpose, a master-slave algorithm, based on stochastic dynamic programming (SDP) and mixed integer linear programming
Publikováno v:
Energy Conversion and Management. 106:151-164
In this paper, the dynamic response of a long penstock pumped-storage hydropower plant which is equipped with a single pump-turbine and a doubly-fed induction machine, is analyzed in detail in generating mode. The pumped-storage hydropower plant is c
Effects of the maximum flow ramping rates on the long-term operation decisions of a hydropower plant
Publikováno v:
Renewable Energy and Power Quality Journal. :514-519
Publikováno v:
Energy Policy. 61:1332-1343
Autor:
Juan I. Pérez-Díaz, José R. Wilhelmi
Publikováno v:
Energy Policy. 38:7960-7970
Environmental constraints imposed on hydropower operation are becoming increasingly restrictive. These constraints may reduce the operational flexibility of a hydro plant and therefore its revenue. The objective of this paper is to assess the economi
Publikováno v:
Electric Power Systems Research. 80:1535-1542
This paper presents a novel approach to solve the short-term operation scheduling problem of a hydropower plant that sells energy in a deregulated electricity market with the objective of maximizing its revenue. This paper proposes a nonlinear progra
Publikováno v:
Energy Conversion and Management, ISSN 0196-8904, 2008-11, Vol. 49, No. 11
Archivo Digital UPM
Universidad Politécnica de Madrid
Archivo Digital UPM
Universidad Politécnica de Madrid
This paper deals with the issue of adjustable speed operation (ASO) of hydropower plants. The main idea of this technique is to allow the turbine speed to change in accordance with hydraulic conditions, thus improving the overall unit efficiency. Gen
Publikováno v:
Renewable Energy and Power Quality Journal. 1:370-376
This paper presents a model to solve the short-term scheduling problem of a hydropower plant in a deregulated system, based on dynamic programming techniques. The objective of this model is to maximize the revenue obtained by selling energy in a comp