Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Jorge Andres Vargas Bermea"'
Autor:
Feras Abu-Jafar, Ian McManus, Jorge Andres Vargas Bermea, Viraphon Thanasarnpisut, Kingkarn Kaewpraphan, Tossapol Tongkum, Pakaporn Wuttikamonchai
Publikováno v:
Day 4 Thu, November 15, 2018.
Lost circulation, while cementing, compromises the objectives of cementing an oil or gas well. Losses encountered during cementingcan cause a weak casing shoe, poor zonal isolation, early water breakthrough for an oil producer, as well as increasing
Publikováno v:
Journal of Petroleum Technology. 66:32-35
Technology Update An efficient removal of drilling fluid is essential to successful cementing operations. When a cement slurry comes into contact with mud residue, the cement may not set properly or adhere to the casing and formation, thereby prevent
Publikováno v:
All Days.
The criteria for success of any primary cementing job is achieving permanent zonal isolation. Incomplete mud removal will affect the zonal isolation in several different ways and may lead to the development of a communication channel in the annulus a
Autor:
Bassam Elatrache, Jorge Andres Vargas Bermea, Salim Taoutaou, Martial Brangetto, Pietro Bonomi, Christian Pasturel
Publikováno v:
International Petroleum Technology Conference.
Abstract Khuff gas reservoir is one of the most challenging gas fields in the Middle East; in the past several wells suffered from sustained casing pressure due to the downhole stresses and other contributing factors. The severity of the leaking annu