Zobrazeno 1 - 10
of 11
pro vyhledávání: '"Johnson Adafin"'
Publikováno v:
Buildings, Vol 12, Iss 7, p 1043 (2022)
Low accuracy in the estimation of construction costs at early stages of projects has driven the research on alternative costing methods that take advantage of computing advances, however, direct implications in their use for practice is not clear. Th
Externí odkaz:
https://doaj.org/article/d90e7beda4704bf780a7a45e92ff1091
Publikováno v:
Journal of Engineering, Design and Technology. 19:41-61
Purpose There has been a lack of research, particularly within the New Zealand (NZ) context, focusing on the identification and assessment of risk factors for construction projects, leading to a wide variation between design-phase elemental cost plan
Publikováno v:
Journal of Engineering, Design and Technology.
Purpose Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among others. Therefore, rather than the impacts of risks on the overal
Publikováno v:
Virtual, Augmented and Mixed: New Realities in Construction. 24:569-587
The New Zealand construction industry continues to face pressures to improve productivity and lower construction costs. With the need to build more houses and infrastructure, quicker, to high quality and on time, there is a need to upscale the use of
Publikováno v:
International Journal of Construction Management. 20:13-28
One aspect of construction project budgeting requiring attention is the inaccuracy of early estimates during design development. Accuracy of estimates is important to project owners and their finan...
Publikováno v:
Smart and Sustainable Cities and Buildings ISBN: 9783030376345
In the absence of strong market forces driving innovation in infrastructure construction environments, the role of the project owner becomes critical in creating the motivation to innovate. Successful infrastructure projects addressed innovation syst
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::1dd0bac6a0d0b391c813755d3d8241e9
https://doi.org/10.1007/978-3-030-37635-2_10
https://doi.org/10.1007/978-3-030-37635-2_10
Publikováno v:
Architectural Engineering and Design Management. 12:189-204
Knowledge of how risks combine to impact variability between design stage elemental cost plans and final tender sums, in traditionally procured commercial building projects, from the architects’ perspectives in NZ is yet to be investigated. This st
Publikováno v:
Journal of Financial Management of Property and Construction. 20:116-131
Purpose– The aim of this study is to investigate the reasons for disparity between design stage elemental cost plan and final tender sum (contract sum) in building procurement. A number of risk factors responsible for such variation were identified
An aspect of client expenditure management that requires attention is the level of accuracy achievable in design-stage elemental cost planning. This has been a major concern for construction clients and practitioners in New Zealand (NZ). Pre-tender e
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::645eba3a1b6c3943f4fcaae7dddb41c2
Publikováno v:
Journal of Management in Engineering. 32
Several researches have indicated that pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. This study first identifies risk factors that influence variability between design-stage