Zobrazeno 1 - 4
of 4
pro vyhledávání: '"John Emesi"'
Publikováno v:
Day 2 Tue, August 02, 2022.
MERO-006T is an oil development well that was drilled and completed in the Q2100X reservoir. The well came into production in March 1988 and has been plagued with incessant wax build up leading to loss of oil production several times over a period of
Autor:
John Emesi, Samson Omoregie, Willhelm Tien, Ayodele Akinfolarin, J. C. Mordi, Mike Usim, Obinna Amah, Chiwar Djauro, Isijokelu Ijeh
Publikováno v:
Day 1 Tue, August 11, 2020.
Drilling long open hole sections has been known to result in many challenges including wellbore instability problems which may lead to stuck pipe problems. However, well design or operational challenges may necessitate making such risky decisions. In
Autor:
Miebaka Wakama, Gloria Erivona, Steve Igbereyivwe, Olufunsho Oyedeji-Olaniyan, John Emesi, Emi Ogbunuju, Godwin Aronu
Publikováno v:
All Days.
Well A (offshore field) was drilled in June 2002 to provide horizontal drainage point on the reservoir. It was completed as a Single String Single (SSS) Producer with 3 ½" tubing string. The sand face was completed with 5 ½" slotted liner (SL) with
Autor:
Alli Mojeed, O. Ubani, C. Ezewu, John Emesi, John Wright, F. Otutu, Morten Haug, C. Onwuzurike, A. Ogunkoya
Publikováno v:
All Days.
Abstract This case study describes the planning and execution of a surface gas fire blowout control operation that resulted in re-entering, killing and abandoning a wellbore that was blowing out at the surface via the annuli "A and B" at an SPDC well